Honeywell IAQPoint2 User Manual page 1329

Air quality monitor
Hide thumbs Also See for IAQPoint2:
Table of Contents

Advertisement

Available languages

Available languages

Installation
monitor mounting plate
IAQPoint monitor
3
1. Drill a 1
/
16
2. Orient the lateral air holes to face the air flow and insert the sampling
tube into the opening.
3. Affix the octagonal plate to the duct.
4. Place a standard electrical box on the octagonal plate (orient the
box's mounting holes vertically) and affix with two #8 metal screws.
5. crew the mounting plate onto the electrical box.
6. Connect the wire from the electrical box to the IAQPoint monitor.
7. Connect the power and outputs as shown in Wiring Details.
8. Verify that the sampling tube feeds into the appropriate port on the
back of the IAQPoint monitor. Press the monitor onto the plastic base
(the latches will click).
electrical box
in. (3 cm) opening in the duct for the sampling tube.
IAQPoint User Manual
Installation Instructions
duct
octagonal plate
Introduction
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E3point

Table of Contents