5.2

Start-up procedure

Before wiring the CC-Link network, use the 64CCL to execute the hardware test.
Refer to the manual of the master unit for details on various procedures including data linking of the CC-Link
system.
5.2.1

64CCL summary start-up procedure

Examination of System Configuration
Installation
Check the following items before turning the
power ON
Power ON
Individual station operation check
(Hardware test)
Power OFF
Connection of cable wiring
The switch setting of 64CCL
Operation start and operation status check
Programming
Start
Refer to Chapter 3
Refer to Chapter 4
- Confirm the input supply voltage.
- Confirm that the RUN/STOP switch of the PLC main unit is set to "STOP".
Refer to Subsection 5.2.2
Refer to Section 5.3
Refer to Chapter 6
Refer to Section 1.4
Refer to Chapter 8
End
5 Wiring, Start-up procedure
5.2 Start-up procedure
Examine the system configuration and
network configuration.
Install the PLC main unit, 64CCL, master
station, power adaptor and dedicated power
supply to the control panel or machine.
Check the following items before turning the
power ON.
Execute the hardware test of each individual
unit to confirm operations.
Connection to the CC-Link network with the
64CCL is possible using CC-Link dedicated cables.
Depending on the type of CC-Link dedicated
cable connected, a specific terminating resistor
is used at the end of the cable.
Set the station number, transmission rate,
number of occupied stations, expanded cyclic
transmission, etc.
Confirm that each unit is installed correctly.
Switch the power supply on and confirm the
operation status and connection status using
LEDs.
Write a control program to the FX
main unit.
Operate the system.