Rack-Mounting By Using Front Mounting Brackets - HP flexnetwork 5510 hi series Installation Manual

Table of Contents

Advertisement

Rack-mounting by using front mounting brackets

This task requires two people.
To install the switch in a 19-inch rack by using the front mounting brackets:
Wear an ESD wrist strap and make sure it makes good skin contact and is reliably grounded.
1.
Determine the mounting position on the switch for the front mounting brackets.
2.
You can install the front mounting brackets at one of the following positions:
HPE 5510 24G SFP 4SFP+ HI, HPE 5510 24G 4SFP+ HI, and HPE 5510 48G 4SFP+ HI
switches—Port side, power supply side, or mid-mounting position.
HPE 5510 24G PoE+ 4SFP+ HI and HPE 5510 48G PoE+ 4SFP+ HI
switches—Mid-mounting position.
Attach the front mounting brackets to the chassis:
3.
a. Unpack the front mounting brackets and the M4 screws (supplied with the switch) for
attaching the brackets to the switch chassis.
b. Align the round holes in the wide flange of one front mounting bracket with the screw holes
in the chassis.
c. Use M4 screws to attach the mounting bracket to the chassis.
d. Repeat the proceeding two steps to attach the other mounting bracket to the chassis.
Figure 6 Attaching the front mounting bracket to the port side
Figure 7 Attaching the front mounting bracket to the power supply side
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents