Break-In Period; Engine; 10-Hour Inspection - BOMBARDIER 1999 Traxter Operator's Manual

Table of Contents

Advertisement

BREAK-IN PERIOD

Engine

A break-in period of 10 operating
hours is required before running the
vehicle at full throttle.
CAUTION: Never mix oil with fuel.
This vehicle has a 4-stroke engine.
Oil must be added to engine base
only.
During this period, maximum throttle
should not exceed 3/4. However,
brief full acceleration and speed
variations contribute to a good
break-in. Continued wide open throt-
tle accelerations, prolonged cruising
speeds and engine overheating are
detrimental during the break-in period.

10-Hour Inspection

As with any precision piece of me-
chanical equipment, we suggest that
after the first 10 hours or 30 days after
the purchase, whichever comes first,
your vehicle be inspected by an autho-
rized Bombardier ATV dealer. This in-
spection will give you the opportunity
to discuss the unanswered questions
you may have encountered during the
first hours of operation.
The 10-hour inspection is at the
expense of the vehicle owner.
46

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents