Break-In Period; Break-In, 10 Hour-Inspection, Inspection Check List - BOMBARDIER Skandic 377 Operator's Manual

1985
Table of Contents

Advertisement

BREAK-IN PERIOD
_
With
Bombardier-Rotax snowmobile
engines, a break-in period is required
before running the vehicle at full throt-
tle. Engine manufacturer recommenda-
tion is 10 to 15 operating hours. Maxi-
mum throttle should not exceed
3/4,
however, brief full acceleration and
speed variations contribute to a good
break-in Continued wide open throttle
accelerations, prolonged cruising speeds,
and lugging are detrimental during the
break-in period.
O
Na TE: Recommended fuel/oil
ratio is 40: 1 during engine break-
in period.
This will assure additional protection
during the initial engine break-in.
~CAUTION:
Remove and clean
... spark plugs after engine break-in.
O
Na TE: A new drive belt requires
a break-in period of 15-25 km (10-
15 miles).
10-HOUR INSPECTION
As with any precision piece of mechan-
ical equipment, we suggest that after
the first 10 hours of operation or 30
days after the purchase, whichever
comes first, that your vehicle be check-
ed by your dealer. This inspection will
give you the opportunity to discuss the
unanswered questions you may have
encountered during the first hours of
operation. Remember that it is easier to
remedy at this time than to allow the
snowmobile to operate until a possible
failure occurs.
The 10 hour inspection is at the ex-
pense of the vehicle owner.
_ _ _ _ _ _ _ _ _ _ _ _ _ _1h

Advertisement

Table of Contents
loading

This manual is also suitable for:

Skandic 377 r

Table of Contents