Toyota 1PZ Repair Manual page 233

Table of Contents

Advertisement

FU-94
FUEL SYSTEM - Injection Pump
(h) Install a new O-ring to the injection pump drive gear.
(i) Install the injection pump drive gear set nut.
(j) Using SST, torque the nut.
SST 09330-00021
Torque: 1,000 kg-cm (72 ft-lb, 98 Nm)
2.
CHECK INJECTION TIMING (See page EM-24)
3.
INSTALL INJECTION PIPES
(See step 3 on page FU-15)
Torque:
"IPZand 1HZ 150 kg-cm (11 ft-lb, 15 Nm)
1HD-T
4.
(w/ BACS)
CONNECT BACS VACUUM HOSE
5.
(w/ PCS)
CONNECT PCS VACUUM HOSE
6.
(1HD-T)
CONNECT BOOST COMPENSATOR HOSE
7.
CONNECT FUEL HOSES TO INJECTION PUMP
8.
CONNECT INJECTION PUMP CONNECTOR
9.
(w/ ACSD)
CONNECT WATER BY-PASS HOSES TO THERMO
WAX
10. (w/A/C)
CONNECT A/C IDLE-UP VACUUM HOSE
11. (A/T)
CONNECT THROTTLE CABLE
12. CONNECT ACCELERATOR CONNECTING ROD
13. INSTALL NO.2 CAMSHAFT TIMING PULLEY
(See step 4 on page EM-39)
14. INSTALL TIMING BELT
(See steps 6 to 9 on pages EM-39 to 41)
250 kg-cm (18 ft-lb, 25 Nm)

Advertisement

Table of Contents
loading

This manual is also suitable for:

1hz1hd-t

Table of Contents