Assembly Of Injection Nozzles; Installation Of Injection Nozzles; Injection Nozzles (1Hd-T - Toyota 1PZ Repair Manual

Table of Contents

Advertisement

FU-14
FUEL SYSTEM - Injection Nozzles (1 PZ and 1 HZ)

ASSEMBLY OF INJECTION NOZZLES

(See page FU-12)
1.
ASSEMBLE INJECTION NOZZLE HOLDERS
Torque: 375 kg-cm (27 ft-lb, 37 N m)
tion and needle adhesion or other defects.
2.

INSTALLATION OF INJECTION NOZZLES

(See page FU-9)
1.
• Over torquing could cause nozzle deformation and
• When installing the injection nozzle, never torque
2.
(a) Assemble the nozzle holder retaining nut, the nozzle
assembly, distance piece, pressure pin, pressure
spring, adjusting shim and nozzle holder body, and
finger tighten the retaining nut.
(b) Using SST, tighten the retaining nut.
SST 09268-64010
NOTICE: Over torquing could cause nozzle deforma-
PERFORM PRESSURE AND SPRAY PATTERN TEST
(See pages FU-10, 11)
INSTALL INJECTION NOZZLES
(a) Place new gaskets and the nozzle seats into the
injection nozzle holes of the cylinder head.
(b) Using SST, install the injection nozzles.
SST 09268-64010
Torque: 650 kg-cm (47 ft-lb, 64 N m )
NOTICE:
needle adhesion or other defects.
the nozzle holder body. Torque the retaining nut
section.
INSTALL NOZZLE LEAKAGE PIPE
(a) Install new gaskets and the leakage pipe with the nuts.
Torque: 300 kg-cm (22 ft-lb, 29 Nm)
(b) Connect the fuel hose to the return pipe.

Advertisement

Table of Contents
loading

This manual is also suitable for:

1hz1hd-t

Table of Contents