Unpacking The Passport 8250 Shipment; Taking Inventory Of The Passport 8250 Shipment - Nortel Passport 241-5101-200 Installation Manual

Nortel networks ethernet switching installation guide
Table of Contents

Advertisement

22 Chapter 2 Preparing for the hardware installation

Unpacking the Passport 8250 shipment

Move the Passport 8250 package to the installation site to unpack the
shipment. If any equipment is damaged, contact your Nortel Networks
representative.
1
2
3
4
5

Taking inventory of the Passport 8250 shipment

After you unpack the Passport 8250 shipment, take inventory of the items
using the "Inventory checklist" (page 23) to ensure you received all the items
ordered. If you are missing an item, contact your Nortel Networks
representative.
241-5101-200 R2.2
— Access is through the use of a special tool, or lock and key, or other
means of security, and is controlled by the authority responsible for
the location.
CAUTION
Risk damage to the equipment
You risk damage to the equipment if the installation site
fails to meet all environmental considerations.
Cut the tape that seals the top flaps, taking care not to cut into the contents
of the box, and fold back all four flaps.
Remove foam and any other packaging material from the top of the unit.
Lift the Passport 8250 unit from the box and place it horizontally on a flat
surface.
Unpack any other equipment shipped with the unit.
Clear the unpacking area of all debris.
Note: NMS software and documentation are not included in the
inventory checklist.

Advertisement

Table of Contents
loading

This manual is also suitable for:

8250

Table of Contents