Installation And Configuration - Nortel Circuit Card 311 Reference

Circuit card
Table of Contents

Advertisement

188 NT5D11 and NT5D14 Lineside T1 Interface cards
Table 85
Lineside T1 card - environmental specifications
Parameter
Operating temperature-normal
Operating temperature-short term
Operating humidity-normal
Operating humidity-short term
Storage temperature
Storage humidity
Table 86 "Lineside T1 card - environmental specifications" (page 188)
the environmental specifications of the Lineside T1 card.
Table 86
Lineside T1 card - environmental specifications
Parameter
Operating temperature-normal
Operating temperature-short term
Operating humidity-normal
Operating humidity-short term
Storage temperature
Storage humidity
Installation and configuration
Installation and configuration of the Lineside T1 card consists of six basic
steps:
Step
1
2
3
4
Copyright © 2003-2008, Nortel Networks
.
Action
Configure the dip switches on the Lineside T1 card for the
environment.
Install the Lineside T1 card into the selected card slots in the IPE
shelf.
Cable from the I/O panel to the Customer Premise Equipment
(CPE) or CSU, MMI terminal or modem (optional), external alarm
(optional), and other Lineside T1 cards for daisy chaining use of
MMI terminal (optional).
Configure the MMI terminal.
Nortel Communication Server 1000
Circuit Card Reference
NN43001-311 01.04 Standard
Release 5.0 23 May 2008
Specifications
15 to +30 C (+59 to 86 F), ambient
10 to +45 C (+50 to 113 F), ambient
20% to 55% RH (non-condensing)
20% to 80% RH (non-condensing)
–50 to +70 C (–58 to 158 F), ambient
5% to 95% RH (non-condensing)
Specifications
15 to +30 C (+59 to 86 F), ambient
10 to +45 C (+50 to 113 F), ambient
20% to 55% RH (non-condensing)
20% to 80% RH (non-condensing)
–50 to +70 C (–58 to 158 F), ambient
5% to 95% RH (non-condensing)
lists

Advertisement

Table of Contents
loading

This manual is also suitable for:

1000 con?guration guide

Table of Contents