Unit Assembly Prior To Installation; Nailing Strips; Installation Access Panel - Regency Greenfire GF900L-NG Owners & Installation Manual

Hide thumbs Also See for Greenfire GF900L-NG:
Table of Contents

Advertisement

installation
UNIT ASSEMBLY PRIOR TO
INSTALLATION
The nailing strips must be correctly positioned and attached before unit
is slid into position.

NAILING STRIPS

The nailing strips come attached to the unit. There is 1 plate on each side,
1 on the top.
The top and side nailing strips are secured to the framing.
IMPORTANT NOTE
Framing depth measurement is noted with the nailing strips
set as far forward on the firebox as possible. The nailing
strips can be adjusted back up to 38mm to allow for varying
thicknesses in non-combustible material & wall finishes.

INSTALLATION ACCESS PANEL

The unit is equipped with a removable access panel for pre-finish installation
of optional components - this panel is located on the lower front face.
1) Remove 6 screws to remove access panel.
2) Easier access to gas connection with panel removed.
3) Install any optional components with access panel removed.
4) Reinstall access panel with 6 screws
Note: Access panel is no longer usable once facing material installed.
10
Nailing Strips
(DO NOT REMOVE NAILING
STRIPS)
Installation Access Panel
Regency GF900L-1 Gas Fireplace

Advertisement

Table of Contents
loading

Table of Contents