Test Pin - Panasonic U-72MF2U9 Service Manual

3way vrf system
Table of Contents

Advertisement

6. Test Pin

When the TEST pin on the Outdoor Unit Control PCB is short-circuited, each part can be operated individually.
• After turning OFF the main unit power, short-circuit the TEST pin (CN22, black), then turn the power ON.
Output is performed in the sequence shown in the table below, for 0.5 seconds each.
Output
1
Relay RY12
2
Relay RY13
3
Relay RY15
4
Relay RY16
5
Relay RY4
1
6
Relay RY6
7
Relay RY18
8
Relay RY19
9
Relay RY11
2
10
Relay RY10
11
Relay RY8
12
Relay RY1
13
Relay RY2
3
14
Relay RY5
4
5
6
7
8
9
Operation
Suction valve 1 (SCV1)
Suction valve 2 (SCV2)
Discharge valve 1 (DCV1)
Discharge valve 2 (DCV2)
Save valve (SAVE)
Oil recovery valve (ORVR)
Pressure balance valve 1 (PBV1)
Pressure balance valve 2 (PBV2)
Refrigerant balance valve (RBV)
Refrigerant control valve (RCV)
Bypass valve (BPV)
Crankcase heater 1 (CH1)
Crankcase heater 2 (CH2)
Accumulation control valve (ACV)
5 - 30
5 - 30
3WAY VRF SYSTEM
Trouble Diagnosis

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

U-96mf2u9U-120mf2u9U-144mf2u9

Table of Contents