Mantel & Trim; Alcove - Jøtul GF 200 DV IPI Installation And Operation Instructions Manual

Gf 200 dv ipi lillehammer direct vent gas stove
Table of Contents

Advertisement

Figure 2.
Parallel Installation Clearances.
Figure 3.
Corner Installation with one elbow requires 5/8 vent.
Figure 4.
Minimum Alcove Clearances.
A
C
B
A
52 1/2 in. (1333 mm)
B
51 in. (1295 mm)
23
C
49 1/2 in. (1257 mm)
D
48 in. (1219 mm)
Figure 5.
Mantel Clearances - stove flush with fireplace face.
A
C
B
A
51 1/2 in. (1308 mm)
B
50 in. (1270 mm)
C
48 1/2 in. (1232 mm)
D
47 in. (1194 mm)
Figure 6.
Mantel Clearances - stove set back into fireplace, 6 1/2" max.
139587_05 GF 200 DV IPI October 2015
Max. Mantel
Depth
11.5”
9.5”
7.5”
5.5”
3.5
E
F
D
G
E
46 1/2 in. (1181 mm)
F
4 1/4 in. (108 mm)
G
25 in. (635 mm)
Long Legs: 27 1/4 in. (692 mm)
Max. Mantel
Depth
11.5”
9.5”
7.5”
5.5”
3.5
F
E
D
G
E
45 1/2 in. (1156 mm)
F
17 3/4 in. (451 mm)
G
25 in. (635mm)
Long Legs: 27 1/4 in. (692 mm)
Min. Mantel
Depth
Max. Top Trim
Depth = 1”
Min. Mantel
Depth
Max. Top Trim
Depth = 1”
Max.
6 1/2”
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents