Maintenance Schedule - Sharp SF-2030 Service Manual

Table of Contents

Advertisement

(6) Paper-feed torque limiter
500-sheet cassette brake spring
Torque limiter
500-sheet cassette brake spring
(7) Optical rail
Note 1: Grease (Molycoat(UKOG-0062FCZZ) or White Molycoat
(UKOG-0158FCZZ)) must be applied to the correct grease
points of each gear. Do not use too much grease.
Note 2: No grease shall be applied inside the gear of the magnetic
clutch.
5. Maintenance Schedule of Options
Maintenance of options must be done during that of the machine.
Maintenance of SF-D
20/D21/SF-DM11 is as follows:
Duplex unit: Perform Simulation 22-9 to read out data in the
duplex counter, and conduct maintenance on the
basis of the data.
Desk:
every 80,000 sheets of copy paper.
Maintenance of RADF/ADF is as follows:
Perform Simulation 22-08 to check the contents of the RADF/ADF
copy counter, and then conduct maintenance every 80,000 sheets of
copy paper.
= lubrication
F = cleaning
ing/mounting
= check(cleaning, replacing and/or adjustment, if
necessary), k= repositioning
v = adjustment
b = replac-
9 – 7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sf-d20Sf-d21Sf-dm11

Table of Contents