REMOVING THE SKID

Skid Hardware:
1
3/8 x 4 in. lag screws
2
1/2 x 4 in. lag screws
3
1/2 x 6 in. lag screws
Do not remove hardware
on front to back pieces
INS 61301607027 Rev A US
To remove the sterilizer from its skid:
1. Refer to Figure 3–3. Remove the hardware from the outer beams:
a. 3/8 x 4 in. lag screws (item 1) that attach the outer cross beams to
the outer beams (16 places).
b. 1/2 x 4 in. lag screws (item 2) that attach the leveling foot retaining
blocks to the outer beams. (18 places on 26 in./39 in. skid, 12
places on 51 in. skid).
c. 1/2 x 6 in. lag screws (item 3) that attach the center cross beam and
retaining blocks to the outer beams (8 places).
FIGURE 3–3. SKID HARDWARE
3
2
1
Outer Beam
1
2
2
3
2
1
Center Cross Beam
and Retaining Blocks
600 Series Steam Sterilizers
Outer
Cross Beam
1
2
2
Leveling Foot
Retaining Block
A07027-BN
3–5