A
adjusting
leveling feet 4–5
transfer carriage height 4–6
alert symbols 1–5
alignment pins 4–2, 4–16
anchoring
non-seismic installations 4–27
sesimic installations 4–28
using hold-down brackets 4–27
using seismic anchoring brackets 4–28
B
blow-down separation tank 5–2
booster pump 5–9
electrical connections 5–9, 5–14, 5–15
mounting 5–12
mounting interface box 5–12
plumbing connections 5–9, 5–13
C
cabinet package 5–26
26" with boiler 5–33
26" without boiler 5–32
39" double door 5–35
39" single door 5–34
51" double door 5–37
51" single door 5–36
hanging the panels 5–32
installing the support brackets 5–30
preparing the side panels 5–29
unpacking 5–27
casters 3–8
checking
heater circuit connections 5–6
motor mounting plate for squareness 4–15
clearances 3–1
cold water supply 4–1
INS 61301607027 Rev A US
D
description of symbols
alerts 1–5
indicators 1–4
labels 1–4
switches 1–3
door lockout switch 2–3
door obstruction switch 2–3
double door installation
recessed at both ends 4–4
recessed at one end 4–4
E
electrical connections
230 Vac installation 4–24
booster pump 4–25, 5–9, 5–14, 5–15
CAS-45A steam boiler 5–5
electrical supply requirements 4–22
GTS-30A steam boiler 5–4
steam boiler 4–25
universal transformer 5–16, 5–17
UPS 5–20
water-saver 5–24
electrical supply
single-phase 4–1
three-phase 4–1
environmental impact assessment 1–2
exterior dimensions (with cabinet package) 7–2
F
feedwater quality (steam boiler) 7–5
H
hold-down brackets 4–26
I
installing
loading car track 4–32
INDEX
Index–1