Installation - Heatrae Sadia ELECTROMAX SOLAR Installation & Servicing Instructions Manual

Table of Contents

Advertisement

3.0 INSTALLATION

3.1 INSTALLATION - G ENERAL
It is recommended that installation of the Electromax Solar is carried out in the following
order:
Location
Domestic Hot Water
Solar
Central Heating
Electrical
3.2 PANEL REMOVAL
Installation will require removal of the panels:
TOP PANEL - Unscrew the two screws located on the top face, about two thirds of the
way back, pull panel towards you and lift up.
LOWER FRONT PANEL - Pull the panel forward.
FRONT PANEL - Remove the lower front panel. Unscrew the two screws located either
side at the bottom of the front panel and pull the panel forwards.
FRONT INSULATION - Remove front and lower front panel and pull front insualtion piece
away from pipework manifolds.
CONTROL PANEL - Remove top panels, front panels and front insulation piece. Unscrew
the two screws located either side at the top of the control panel and allow the control
panel to drop forwards.
CONTROL PANEL REAR COVER - Open the control panel. Unscrew the two screws
located either side of the control panel rear cover and remove the rear cover.
FIGURE 04: PANEL REMOVAL
TOP PANEL
SCREWS
TOP
PANEL
FRONT
INSULATION
FRONT
PANEL
FRONT
PANEL
SCREWS
LOWER
FRONT
PANEL
CONTROL PANEL
SCREWS
REAR COVER
REAR COVER
SCREWS
CONTROL PANEL
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents