Installation Preparation
PreparationWITHOUTan AccessoryStorage
Drawer
PREPARE THE OPENING (CONT.)
Installation
over a GE/Monogram
Oven:
30"
23-1/2"
Construct
Solid
Bottom Min.
3/8" Plywood
Supported
by
2x4 or 2x2
Runners all
/
Four Sides
2" Min.
(3" recommended)
Per Oven
Requirement
• If you are replacing
u GE/tVlonogrum electric
double oven with the combined
installation
of
on Advontium
240V and u single oven, use the
dimensions
shown. The middle rail separating
the two openings
may need to be larger than
the 2" minimum
shown.
PREPARE THE OPENING
(CONT.)
Installation
over a GE/Monogram
Oven and
Warming
Drawer:
30" --
23-1/2"
Construct
Solid Bottom
Hin. 3/8"
Plywood
Supported by
2x4 or 2x2
Runners all
Four Sides
Min.
(3" recommended)
Per Oven
Requirement
2" Hin.
NOTE: Additional
clearances
between the cutouts
may be required. Check to be sure the oven
supports
above the Worming
Drawer location do
not obstruct
the required interior depth and height.
See Warming
Drawer installation
instructions
for
details.
A CAUTION: For
p ersonal safety,
the
mounting
surface must be capable of supporting
the cabinet load, in addition to the added weight
of this approximate
80-pound
oven, plus additional
oven loads of up to 50 pounds or o total weight
of 130 pounds.
APRECAUCI6N: Poro
s eguridod
personal, Io superficie de montoje debe poder
soportor
Io cargo del gabinete, ademc_s del peso
aproximodo
de 80 libros del homo, mc_s los
cargos odicionales
del homo de hasto 50 libros
o un peso total de hosta 130 libros.
Need help?
Do you have a question about the PSB9240DF and is the answer not in the manual?
Questions and answers