Installation Preparation
PreparationWITHOUTan AccessoryStorage
Drawer
PREPARE THE OPENING
The Advantium
240V can be installed in
combination
with other GE/Monogram
appliances.
Always follow each product's
Installation
Instructions
to complete
the installation.
Single
Advantium
240V Installation:
Order o 50" wide single oven cabinet or cut the
opening in o wall to the dimensions
shown.
30"
23-1/2"
4- 25-1/4" -_
17-1/2"
W
36-314"
Min.
Construct
Bose
Min. 3/8"
Plywood
Supported
by 2x4 or
2x2 Runners
oil Four
Sides
• Always maintain
36-3/4" minimum
height from
the floor to the cutout in any single or combined
installation.
,, Allow 2-1/8" case trim overlap on the sides and
7/8" overlap on the bottom
of the opening for
oil models. Allow 1-1/4" case trim overlap on the
top for models PSB9120 and 3/4" overlap on the
top for models ZSC2200, ZSC2200, ZSC2201 and
ZSC2202.
,, Oven overlaps will conceal cut edges on all sides
of the opening.
When installed over o single oven or o worming
drawer, allow at least 2" between the two openings.
This separation
will provide clearance
for bottom
overlap of the Advuntium
240V and the other
appliance
overlaps.
Construct o solid oven floor of 3/8" min. thick plywood
supported by 2 x 4 or 2 x 2 runners on all sides.
• The support must be level and rigidly mounted,
flush with the bottom edge of the cutout.
PREPARE THE OPENING
{CONT.}
Installation
over a GE/Honogram
Warming
Drawer:
30"
17-1/2"
36-314"
Min.
25-1/4"
Construct
Solid Bottom
Min. 3/8"
Plywood
Supported
by 2x4 or 2x2
Runners all
Four Sides
2" Min.
(3" recommended
_rworming
drawer
requirement
NOTE: Additional
clearances
between the cutouts
may be required. Check to be sure the oven supports
above the Warming
Drawer locution do not obstruct
the required interior depth and height. See Warming
Drawer installation
instructions
for details.