Preparing And Starting The Water Intake Process - Miele H6890BP Operating And Installation Instructions

Hide thumbs Also See for H6890BP:
Table of Contents

Advertisement

Moisture Plus d
Preparing and starting the water
intake process
^ Fill a suitable container with the
required amount of fresh tap water.
^ Open the door.
^ Pull the water intake pipe forwards
(located below the control panel on
the left).
^ Immerse the end of the water intake
pipe in the container with tap water.
70
^ Touch OK.
The water intake process will begin.
The amount of water actually drawn up
into the oven may be less than the
amount specified as required, leaving a
small amount in the container.
The intake process can be
interrupted and restarted at any time
by selecting "Stop" or "Start".
^ Remove the water container after the
water intake process.
^ Confirm the message telling you that
the process is complete with OK.
^ Close the door.
You will hear the pump briefly as the
remaining water in the water intake pipe
is drawn into the oven.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents