First Degree Fitness Apollo Hybrid AR Owner's Manual page 9

Table of Contents

Advertisement

Next, install the Mainframe[1] onto the Side Rail Assembly as shown. You will
need 8x M8x45mm Bolts[11], 16x M8 Washers[7], 8x M8 Standard Nuts[8] and
8x M8 Nylock Nuts[8].
Secure but do not tighten. You may find that the lower bracket bolts can be difficult
to access. You can tighten these bolts completely once the rower is standing in the
vertical position so for the moment, simply align and loosely thread lower bolts/nuts.
Nylock Nuts must be
outside the standard
Nylock
nut and washer to properly
Nuts
secure assembly.
Note: Clean wheels and tracks weekly with a soft dry cloth in order to decrease the
rate of wear on both wheels and track.
Nylock
Nuts
9
Bolt Assembly Close Up
M8x45mm Bolt
M8 Standard Nut
M8 Nylock
M8 Washer
Nut
M8 Washer

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Apollo Hybrid AR and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents