Mitsubishi MJ-EZ6CX-S1-IT Service Manual page 36

2010
Table of Contents

Advertisement

( 4 ) Removing and replacing the operation control board
① Pull out the water tank.
→ ( Reference : Removing the water tank )
② Remove the left case.
→ ( Reference : Removing the left case )
③ Remove the front and back cover.
④ Remove the catches ( 2 ) which fix the switch
holder from the louvre side of the right case with a
slotted screwdriver. Remove the switch holder.
⑤ Remove the operation control board setscrews ( 3 )
and all the connectors of the operation control
board.
→ ( Removing and replacing the operation control
board )
Operation
control board
36
Switch holder
Louvre
Operation control board setscrew
Inside of the
switch holder
Back cover
Catches ( 2 )
Louvre
Operation control board
Front cover

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents