Installation Method For Prevention Of Falling Over; Drain Pipe Disposal; Installation Service Space; Precaution On Installation - Daikin RZQG71L8V1B Installation Manual

Split system air conditioners
Table of Contents

Advertisement

6.2.

Installation method for prevention of falling over

If it is necessary to prevent the unit from falling over, install as shown
in the figure.
prepare all 4 wires as indicated in the drawing
unscrew the top plate at the 4 locations indicated A and B
put the screws through the nooses and screw them back tight
C
A Location of the 2 fixation holes on the front side of the unit
B Location of the 2 fixation holes on the rear side of the unit
C Wires: field supply
6.3.

Drain pipe disposal

Make sure the drain works properly.
In regions where buildups of snow can be expected, the
accumulation and freezing of snow in the space between the
heat exchanger and external plate may lower operating
efficiency. In this case, drill a knock-out hole in the lower part of
the bottom frame so the snow can escape. When creating a
knock-out hole, use a Ø6 mm drill bit to open round holes
connected to the circumference of the knock-out hole (4 places).
After punching the knock-out hole, the application of repair-type
paint on the surface around the edge sections is recommended
to prevent rust.
7.

Installation service space

The installation service spaces shown in the illustrations are
based on an air intake temperature of 35°C (DB) for COOL
operation. In regions where the air intake temperature regularly
exceeds 35°C (DB), or if the heat load of outdoor units is
expected to regularly exceed the maximum operating capacity,
reserve a larger space than that indicated at the air intake side
of units.
Regarding the required air outlet space, position the units with
consideration to the space required for the onsite refrigerant
piping work as well. Consult your dealer if the work conditions do
not match those in the drawings.
RZQG71~140L + RZQSG100~140L
Split system air conditioners
4P339538-1A – 2014.03
A
B
1
1 Drill
2
2 Area around knock-
3
out hole
3 Knock-out hole
7.1.

Precaution on installation

(A) In case of non-stacked installation
(A-1) Single unit installation
(A-2) Multiple units installation (2 units or more)
-
Secure appropriate space when using a side piping outlet.
Suction side obstacle
Discharge side obstacle
Left side obstacle
Right side obstacle
Top side obstacle
(B) In case of stacked installation
1.
In case obstacles exist in front of the outlet side.
A
2.
In case obstacles exist in front of the air inlet.
A
Do not exceed two levels for stacked installation.
Install a roof cover as shown in the figures above (field supply),
as outdoor units with downward drainage are subject to dripping
and freezing of that drain water.
Install the upper outdoor unit so that its bottom plate is at
sufficient height above the roof cover. This is to prevent the
buildup of ice on the bottom plate outer surface. A space of at
least 500 mm is recommended.
It is not necessary to install a roof cover if there is no danger of
drainage dripping and freezing. In this case, the space between
the upper and lower outdoor units should be at least 100 mm.
Close the gap between the upper and lower units so there is no
re-intake of discharged air.
(C) In case of multiple-row installation (for roof top use, etc.)
1.
In case of installing one unit per row.
(Unit : mm)
(See figure 1)
Obstacle is present
1
In these cases, close the
bottom of the installation
frame to prevent the
discharged air from being
bypassed
2
In these cases, only 2 units
can be installed.
This situation is not allowed
A Roof cover (field supply)
A Roof cover (field supply)
Installation manual
6