Download Print this page

lehman Trikes Raider XL 2014+ Installation Instructions Manual page 19

Advertisement

4. See Fig. 4. Remove snap ring from one side of
pin on park brake lever. Hold handle on its side
and push release button at end of handle to
allow pin to slide out.
(1) Park Brake Lever– GB1099M
5. See Fig. 4. Place hand brake within park brake
bracket, ensuring ratchet is secure on cross
brace. Attach with pin and snap ring.
6. See Fig. 4. Attach park brake cable pulling
bracket (LB1294) to hand brake using clevis
pin and cotter key.
7. See Fig. 5. Route long LH park brake cable
above differential and down RH side of hous-
ing. Attach to top of differential housing with
clamp as shown.
(1) 1/2" Clamp– S001654
(1) M8 x 30 Button Head Bolt– CB1929
8. See Fig. 5. Route short RH cable under differ-
ential and into park brake bracket. Attach LH
and RH cables together with clamp to lower
axle tube bolt as shown. Check for proper
clearance with other components.
(1) 3/4" Clamp– GC0108
9. See Fig. 6. Attach park brake cables to bracket
as shown using nuts and washers provided on
cables. Use one nut and washer on each side
of bracket
10. See Fig. 6. Thread one 5/16" NF nut onto each
brake cable. Place threaded end of brake ca-
bles through holes in cable pulling bracket.
Thread a second nut onto each brake cable on
the front of the bracket.
(4) 5/16" Nuts– CN3009
11. Ensure park brakes are properly set up, adjust
park brake nuts on both sides. Brakes should
hold within 3-4 clicks on lever.
PARK BRAKE INSTALLATION
Secure with
clamp
Attach cables to
park brake bracket
19
Fig. 4
Fig. 5
Attach LH cable
to housing
Fig. 6
Attach cable ends
to pulling bracket
with jam nuts
2014+ XL Raider

Advertisement

loading

Related Products for lehman Trikes Raider XL 2014+