Start Up Procedure - ECR International CCB-150 Installation, Operation & Maintenance Manual

Combi wall mounted gas boiler
Table of Contents

Advertisement

9.1 Fill Boiler With Water And Purge Air
NOTICE
To maintain boiler effi ciency and prevent boiling
inside the heat exchanger, fl ush entire heating
system until clean.
• Flush heating system, including all heating zones.
• Fill boiler with potable water.
• Fill boiler and system piping with water (or
antifreeze-water solution, if used). See antifreeze
information Section 5.3 page 11. Purge air from
boiler using air vent. Purge air from system piping.
• Inspect system piping and boiler connections.
Repair any leaks immediately.
• Activate all heating zones and calls for heat,
including CH calls and DHW calls (if available).
• Close manual gas shut off valve. Let system run for
30 minutes. When boiler goes into lockout, reset
boiler by pressing "Reset" button until boiler resets.
• Do not open gas shutoff valve until all air is purged
from system.
9.2 Boiler Start-up and Operational Test
Verify air is purged from hydronic piping
1.
System test pumps - verify each pump is
2.
operational
Verify gas piping
3.
• Confi rm pressure test. See section 7.3 page 20.
• Visually inspect piping to determine there are no
open fi ttings or ends, and all valves at unused
outlets are closed and plugged/capped.
• Purge air from piping
• Check piping and connections for leaks immediately
after gas is turned on. Shut off gas supply and
make necessary repairs if leaks found.
Follow OPERATING INSTRUCTIONS to initiate boiler
4.
operation. See section 10.
Inspect combustion air and vent piping. Verify pipe
5.
is not leaking and terminations are unobstructed and
vent gas discharge is not a nuisance or hazard.
Verify boiler operates.
6.
Check control module operation.
7.
Check fi eld sourced limits, low water cutoffs, etc. per
8.
manufacturer's instructions.

9 - START UP PROCEDURE

Asphyxiation hazard. Carbon monoxide is odorless,
tasteless, clear colorless gas, which is highly toxic.
Carbon monoxide production shall not exceed
400ppm. Failure to follow these instructions could
result in death or serious injury.
Asphyxiation hazard. Verify cap is fi rmly placed on
combustion analyzer port to prevent CO emission.
Failure to do so could result in death or serious
injury.
9.3 Burner Pressure Adjustment
Unit has fl ame modulation, with two fi xed pressure values:
minimum and maximum. See Sec. 12, page 34.
Connect pressure gauge to pressure point "B" downstream
of the gas valve.
Remove protection cap "D".
1.
Operate boiler in TEST mode.
2.
Adjust maximum pressure by turning screw "G"
3.
clockwise
Disconnect one of two connectors "C" from modulation
4.
regulator "F" on the gas valve.
Adjust minimum pressure by turning screw "E" clockwise
5.
decrease it.
Turn burner on and off, verify minimum pressure
6.
remains stable.
Reconnect connector "C" detached from modulation
7.
regulator "F" on the gas valve.
Verify maximum pressure has not changed.
8.
Replace protection cap "D".
9.
To end TEST mode, repeat activation sequence or wait
10.
15 minutes.
9.4 To Enter Test Mode/Adjust Heating Power
Press CH+/- buttons at the same time for 5 seconds.
• 3 way valve is in CH position and burner is forced at
100%. Boiler automatically exits test mode after 15
minutes or to exit test mode manually press CH +/-
buttons together for 5 seconds.
• With Ch +/- buttons you can adjust Max power from (0
to 100%)
9.5 Ignition Adjustment
To adjust ignition, switch boiler to TEST mode (See Start
up Procedure). Press DHW buttons to increase or decrease
power (min.= 00, max. = 60). Press RESET button within
5 seconds and ignition remains set. Exit TEST mode.
24
WARNING
WARNING
to increase pressure and counter clockwise
to decrease.
to increase the pressure and counter clockwise
to