ECR International CHB-100 Installation, Operation & Maintenance Manual

Wall mounted gas boiler
Hide thumbs Also See for CHB-100:
Table of Contents

Advertisement

Available languages

Available languages

CHB-100 / CHB-130 / CHB-150
INSTALLATION, OPERATION & MAINTENANCE MANUAL
MANUEL D'INSTALLATION, D'UTILISATION ET D'ENTRETIEN
Model
Modèle
WALL MOUNTED GAS BOILER
CHAUDIÈRE MURALE À GAZ
Manufactured for:
ECR International, Inc.
2201 Dwyer Avenue, Utica NY 13501
web site: www.ecrinternational.com
Fabriquée pour :
ECR International, Inc.
2201 Dwyer Avenue, Utica NY 13501
site web : www.ecrinternational.com
Réf. 240010633, Rév. D [20/01/2016]

Advertisement

Table of Contents
loading

Summary of Contents for ECR International CHB-100

  • Page 1 Model Modèle CHB-100 / CHB-130 / CHB-150 WALL MOUNTED GAS BOILER INSTALLATION, OPERATION & MAINTENANCE MANUAL CHAUDIÈRE MURALE À GAZ MANUEL D’INSTALLATION, D’UTILISATION ET D’ENTRETIEN Manufactured for: ECR International, Inc. 2201 Dwyer Avenue, Utica NY 13501 web site: www.ecrinternational.com Fabriquée pour : ECR International, Inc.
  • Page 2 DIMENSIONS Figure 1 - Overall Dimensions CHB 100 CHB 130 CHB 150 TOP VIEW TOP VIEW TOP VIEW 3 11/32 in 4 17/32 in 4 17/32 in 3 11/32 in 4 21/64 in 4 17/32 in 4 17/32 in 4 21/64 in 3 11/32 in 4 17/32 in 3 35/64 in...
  • Page 3: Table Of Contents

    TABLE OF CONTENTS 1 - Introduction ........................4 2 - Important Safety Information ................... 5 3 - General view and main components .................. 6 4 - Locating Boiler ....................... 9 5 - Hydronic Piping ......................11 6 - Combustion Air And Vent Piping - Category I (Chimney Vent) ..........16 6 - Combustion Air And Vent Piping- Category I (Chimney Vent) ..........
  • Page 4: Introduction

    • Integral Dual Limit. Information and specifi cations outlined in this manual in effect at the time of printing of this manual. ECR International, Inc. reserves the right to discontinue, change specifi cations or system design at any time without...
  • Page 5: Important Safety Information

    2 - IMPORTANT SAFETY INFORMATION 2.1 General 2.3 Installation shall conform to requirements of Boiler installation shall be completed by qualifi ed agency. authority having jurisdiction or in absence of such See glossary for additional information. requirements: • United States •...
  • Page 6: General View And Main Components

    3 - GENERAL VIEW AND MAIN COMPONENTS Figure 2 Component Listing CHB 100 CHB 130...
  • Page 7 3 - GENERAL VIEW AND MAIN COMPONENTS CHB 150 5 Sealed Chamber 27 Copper Heat Exchanger 95 3 Way Diverter Valve 7 Gas Inlet 28 Exhaust Manifold 114 Water Pressure Switch 10 Supply System 29 Exhaust Outlet Manifold 209 Hot Water Tank Delivery 11 System Return 32 Heating Circulating Pump 210 Hot Water Tank Return...
  • Page 8 3 - GENERAL VIEW AND MAIN COMPONENTS WARNING Fire, explosion, asphyxiation and electrical shock hazard. Disconnect electrical power supply and turn off gas at shutoff valve before attemting to remove boiler jacket. Failure to follow these instructions could result in death or serious injury.
  • Page 9: Locating Boiler

    4 - LOCATING BOILER 4.1 Boiler Location Considerations Figure 5 - Boiler Clearances • Ambient room temperature always above 32°F (0°C) to prevent freezing. • Approved for installation in closets. • Protect gas ignition system components from water (dripping, spraying, rain, etc.) during operation and service (circulator replacement, control replacement, etc.).
  • Page 10 4 - LOCATING BOILER Pre-pipe supply and return water connections Figure 6 - Wall Mounting Bracket with factory fi ttings before wall mounting. 4.3 Wall Mounting 64" 64" Mount boiler on wall using wall mounting bracket included (6cm) (6cm) with unit. •...
  • Page 11: Special Conditions

    5 - HYDRONIC PIPING 5.1 General Conditioning chemicals must ensure complete deoxygenation of water and contain specifi c protective agents for yellow • Install piping in accordance with authority having jurisdiction. metals (copper and its alloys), anti-fouling agents for NOTICE limescale at least up to 150 ppm CaCO3, pH neutral stabilizers and, in low temperature systems, specifi...
  • Page 12 5 - HYDRONIC PIPING 5.4 Storage Tank Connection For Domestic Hot Figure 7 - Indirect Tank Performance Chart Water Production • Unit’s electronic board is arranged for managing an AVAILABLE PUMP HEAD vs FLOW for DHW INDIRECT TANK external storage tank for domestic hot water production. •...
  • Page 13 5 - HYDRONIC PIPING • Size and arrange discharge piping to avoid reducing Figure 9 - Safety Relief Valve Discharge safety relief valve relieving capacity below minimum Piping relief valve capacity stated on rating plate. • Run pipe as short and straight as possible to location protecting user from scalding and properly drain piping.
  • Page 14 5 - HYDRONIC PIPING 5.6 System Piping Figure 10 - LWCO Suggested Probe Location • Systems with automatic fi ll valves require back fl ow prevention device. • Single boiler system. LWCO Air Vent Additional considerations: • Boiler control is designed for single central heating pump.
  • Page 15 5 - HYDRONIC PIPING Figure 11 - Hydronic Piping - CHB 100/130/150 Domestic Hot Water Outlet Domestic Cold Water Inlet Heating System Supply Heating System Return Diverter Valve 209 Hot Water Tank Delivery 210 Hot Water Tank Return...
  • Page 16: Combustion Air And Vent Piping - Category I (Chimney Vent)

    6 - COMBUSTION AIR AND VENT PIPING - CATEGORY I (CHIMNEY VENT) Common venting shall not be allowed. Boiler and WARNING other certifi ed appliances. appliances can share same Boiler and venting installations shall be performed chimney vent. Consult appropriate Vent Sizing Tables by a qualifi...
  • Page 17: Removing Existing Boiler From Common Venting System

    6 - COMBUSTION AIR AND VENT PIPING- CATEGORY I (CHIMNEY VENT) 6.2 Minimum Vent Pipe Clearance Test for spillage at the draft hood relief opening after 5 minutes of main burner operation. Use fl ame of a • Use Type B vent pipe through crawl space. Where vent match or candle, or smoke from a cigarette, cigar, or pipe passes through combustible wall or partition, use pipe.
  • Page 18: Combustion Air And Vent Piping Of Direct Vent And Category Iii

    6 - COMBUSTION AIR AND VENT PIPING OF DIRECT VENT AND CATEGORY III Induced Draft Boilers D. The venting system shall terminate at least 3 feet 0.9m) above any forced air inlet located within Horizontal (Category III) venting systems installation 10 feet (3m).
  • Page 19 6 - COMBUSTION AIR AND VENT PIPING OF DIRECT VENT AND CATEGORY III If the horizontal vent must go through a crawl space or WARNING other unheated space, the cool temperatures will likely Vent extending through exterior wall shall not cause the fl...
  • Page 20 6 - COMBUSTION AIR AND VENTILATION Provide combustion air and ventilation air in accordance • All Outdoor Air. Provide permanent opening(s) with the section “Air for Combustion and Ventilation,” communicating directly or by ducts with outdoors. of the National Fuel Gas Code, ANSI Z223.1/NFPA 54, ◊...
  • Page 21 6 - COMBUSTION AIR AND VENT PIPING Figure 13 - Horizontal Venting Clearances NOTICE Figure 14 - Two Pipe Venting Maintain 12” (30cm) US, 18” (46cm) Canada clearance above highest anticipated snow level or grade. = Combustion Air / = Venting)
  • Page 22 6 - COMBUSTION AIR AND VENT PIPING NOTICE Figure 15 - Chimney Venting with Room Air Single Wall Refer to section 6.1, numbers 3 through 12, page 15 of this manual for proper installation. = Combustion Air / = Venting) Figure 16 - Chimney Venting with Outside Air Single Wall = Combustion Air /...
  • Page 23: Gas Supply Piping

    7 - GAS SUPPLY PIPING Figure 17 Manual Main Gas Shutoff Valve CAUTION Outside Boiler Jacket WHAT TO DO IF YOU SMELL GAS With Manufacturer Suggested Piping With Drip Leg • Do not try to light any appliance. • Do not touch any electrical switch; do not use any phone in your building.
  • Page 24: Electrical Connections

    8 - ELECTRICAL CONNECTIONS Figure 18 - Terminal Block WARNING Electrical shock hazard. Turn OFF electrical power supply at service panel before making electrical connections. Failure to do so could result in death or serious injury. 8.1 General Electrically bond boiler to ground in accordance with requirements of authority having jurisdiction.
  • Page 25: Burner Pressure Adjustment

    9 - START UP PROCEDURE 9.1 Fill Boiler With Water And Purge Air WARNING NOTICE Asphyxiation hazard. Carbon monoxide is odorless, To maintain boiler effi ciency and prevent boiling tasteless, clear colorless gas, which is highly toxic. inside the heat exchanger, fl ush entire heating Carbon monoxide production shall not exceed system until clean.
  • Page 26 9 - START UP PROCEDURE 9.6 Check Combustion and Input Rate Figure 19 - Test Ports Natural Gas Measure input rate. Turn off gas to all other Vent Gases appliances. Test Port • Activate some heating zones to dissipate heat. •...
  • Page 27: Operating Instructions

    10 - OPERATING INSTRUCTIONS WARNING CAUTION If you do not follow these instructions WHAT TO DO IF YOU SMELL GAS exactly, a fi re or explosion may result • Do not try to light any appliance. causing property damage, personal injury •...
  • Page 28: Control Panel

    10 - OPERATING INSTRUCTIONS 10.3 Checks During Operation 10.5 Indicator During Operation • Boiler is arranged for connection to an external storage Heating tank for hot water production (optional). All functions relevant to domestic hot water production are only Call for heat (generated by Room Thermostat) is indicated active with the optional water tank sensor connected.
  • Page 29 10 - OPERATING INSTRUCTIONS Summer/Winter Switch over Boiler Ignition Supply unit with electricity. NOTICE Activating this button will keep your boiler from operating. Verify that boiler is not required to run Domestic Hot Water (DHW) needs. Press the button for 2 seconds. Boiler ignition For 120 seconds display will show FH which identifi...
  • Page 30 10 - OPERATING INSTRUCTIONS Hot water tank exclusion (economy) Compensation curve and curve offset Hot water tank temperature maintaining/heating can be Press the button (see item 6 on the control panel display) excluded by the user. If excluded, domestic hot water will for 5 seconds once to display the actual compensation not be delivered.
  • Page 31 10 - OPERATING INSTRUCTIONS Press the button (see item 6 on the control panel display) for 5 seconds again to exit parallel curve adjustment mode. If the room temperature is lower than the required value, it is advisable to set a higher order curve and vice versa. Proceed by increasing or decreasing in steps of one and check the result in the room.
  • Page 32 10 - OPERATING INSTRUCTIONS Water system pressure adjustment The fi lling pressure with system cold, read on the boiler water gauge, must be approximately 11 psi. If the system pressure falls to values below minimum, the boiler control will activate fault F37. Low system pressure fault Once the system pressure is restored, the boiler will activate the 120-second air venting cycle indicated on the...
  • Page 33: General Maintenance And Cleaning

    11 - GENERAL MAINTENANCE AND CLEANING 11.1 Beginning of Each Heating Season 11.2 Annual Shut Down Procedure • Check boiler area is free from combustible materials, • Follow instructions “To Turn Off Gas To Appliance” unless gasoline, and other fl ammable vapors and liquids. boiler is also used to supply domestic hot water.
  • Page 34: Ratings And Capacities

    12 - RATINGS AND CAPACITIES Data Unit CHB100 CHB130 CHB150 Boiler category Category I-III Category I-III Category I-III Type of Gas Natural gas Natural gas Natural gas Btu/hr 100000 130000 150000 Maximum Input 0-2000 Ft 29.3 38.2 44.0 Btu/hr 90000 117000 135000 Maximum Input 2000-4500 Ft...
  • Page 35: Ratings And Capacities

    Rating, Water Size Capacity AFUE (MBH) (1)(3) Maximum Minimum (MBH) (1)(2) CHB-100 31.5 73.0 CHB-130 43.5 96.0 CHB-150 50.0 110.0 1000 Btu/hr (British Thermal Units Per Hour) Heating Capacity and AFUE (Annual Fuel Utilization Effi ciency) are based on DOE (Department of Energy) test procedures.
  • Page 36 12 - RATINGS AND CAPACITIES Diagrams Pressure - power diagrams 95 100 105 110 115 120 125 130 135 140 145 BTU/h x 1000 Losses of load / head of circulators 20,00 18,00 16,00 14,00 12,00 10,00 8,00 6,00 4,00 2,00 0,00 10,0...
  • Page 37: Trouble Shooting

    13 - TROUBLE SHOOTING Diagnostics The boiler is equipped with an advanced self-diagnosis system. In case of a boiler fault, the display will fl ash indicating the fault code. There are faults that cause permanent shutdown (marked with the letter “A”): to restore operation just press the RESET button for 1 second or RESET;...
  • Page 38: Wiring Diagram

    WIRING DIAGRAM *155 *138 - Optional Outdoor Sensor kOhm *370 *155 - Optional Indirect Tank Sensor *370 - Field Source LWCO *138 kOhm 120V 60Hz DBM34A +15V 307 - Field source second CH pump G L1 Modulating fan Heating circulating pump DHW temperature sensor (see kit) Gas valve NOTICE...
  • Page 39: Repair Parts List - Chb

    REPAIR PARTS LIST - CHB Part Number Description Model FE3980B830 CASING "CTR" CHB-100/130 FE3980B990 CASING "CTR" CHB-150...
  • Page 40 REPAIR PARTS LIST Part Number Description FE3980C200 KIT CONTROL BOX FE3980B851 KIT CONTROL BOARD DBM34A FE3980C210 KIT FRONT COVER "CTR" FE3980B840 KIT PRESS.TEMP.GAUGE FE3980B861 KIT WIRING FE3980C220 KIT MONO CABLE EL.
  • Page 41 REPAIR PARTS LIST...
  • Page 42 REPAIR PARTS LIST - CHB Part Number KEY Description CHB 100 CHB 130 CHB 150 KIT GASKETS SET FE3980B870 FE3980B870 FE3980C000 MONO HEAT EXCHANGER FE3980C230 FE3980B880 FE3980C030 KIT GASKET FE3980C010 FE3980C010 FE3980C010 KIT CLIP D18 FE3980C020 FE3980C020 FE3980C020 TEMP SENSOR DP FE3980G050 FE3980G050 FE3980G050...
  • Page 43 REPAIR PARTS LIST *CHB- 130 SHOWN...
  • Page 44 REPAIR PARTS LIST - CHB Part Number Description CHB 100 CHB 130 CHB 150 KIT GASKETS SET FE3980B930 FE3980B930 FE3980B930 KIT FLUE GASES OUTLET FE3980C160 FE3980C160 FE3980C160 BEND FAN GASKET FE3980C100 FE3980C100 FE3980C100 KIT FAN FE3980C250 FE3980B940 FE3980B940 PRESSURE TEST POINT FE3980C090 FE3980C090 FE3980C090...
  • Page 45 DIMENSIONS Figure 1 - Dimensions CHB 100 CHB 130 CHB 150 VUE DE DESSUS VUE DE DESSUS VUE DE DESSUS 3 11/32 in 4 17/32 in 4 17/32 in 3 11/32 in 3 11/32 in 4 17/32 in 3 35/64 in 4 21/64 in 4 21/64 in 4 17/32 in...
  • Page 46 INDEX 1 - INTRODUCTION ............................ 47 2 - INFORMATIONS IMPORTANTES SUR LA SÉCURITÉ ..................48 3 - VUE D'ENSEMBLE ET PRINCIPAUX ÉLÉMENTS .................... 49 4 - EMPLACEMENT DE LA CHAUDIÈRE ......................52 5 - TUYAUTERIE HYDRONIQUE ........................54 6 - TUYAUTERIE DE L'AIR DE COMBUSTION ET D'ÉVENT - CATÉGORIE I (CHEMINÉE) .......... 59 6 - TUYAUTERIE D'AIR DE COMBUSTION ET DE VENTILATION - CATÉGORIE I (CONDUIT DE CHEMINÉE) ....
  • Page 47 Informations et spécifi cations publiées dans ce manuel en vigueur au moment de son impression. ECR International, Inc. se réserve le droit de mettre fi n, de modifi er les spécifi cations ou la conception de l'installation à tout moment, sans...
  • Page 48 2 - INFORMATIONS IMPORTANTES SUR LA SÉCURITÉ 2.1 Généralités 2.3 L'installation doit être conforme aux critères L'installation de la chaudière doit être effectuée par un établis par l'organisme compétent ou, en l'absence installateur compétent. Consultez le glossaire pour plus de tels critères : d'informations.
  • Page 49 3 - VUE D'ENSEMBLE ET PRINCIPAUX ÉLÉMENTS Figure 2 Liste des éléments CHB 100 CHB 120...
  • Page 50 3 - VUE D'ENSEMBLE ET PRINCIPAUX ÉLÉMENTS CHB 150 5 Chambre hermétique 27 Échangeur de Chaleur en cuivre 95 Vanne directionnelle à 3 Voies 7 Arrivée de gaz 28 Collecteur d'échappement 114 Commutateur DE Pression D'eau 10 Installation d'alimentation 29 Sortie Collecteur D'échappement 209 Alimentation ballon d'eau chaude 11 Retour installation 32 Pompe de circulation de chauffage...
  • Page 51 3 - VUE D'ENSEMBLE ET PRINCIPAUX ÉLÉMENTS AVERTISSEMENT Risque d'incendie, d'explosion, d'asphyxie et d'électrocution. Coupez l'alimentation électrique, de gaz au niveau de la vanne d'arrêt avant de tenter de déposer la jaquette de la chaudière. Le non-respect de ces instructions peut causer de graves lésions ou la mort.
  • Page 52 4 - EMPLACEMENT DE LA CHAUDIÈRE 4.1 Remarques sur l'emplacement de la chaudière Figure 5 - Dégagements de la chaudière • Température ambiante toujours supérieure à 0°C (32°F) pour éviter de geler. • Chaudière homologuée pour l'installation dans des placards. •...
  • Page 53 4 - EMPLACEMENT DE LA CHAUDIÈRE Fourniture en amont des tuyaux et Figure 6 - Support de montage mural raccordements d'eau de retour avec accessoires d'usine avant le montage mural. 4.3 Montage mural 64" 64" (6cm) (6cm) Montez la chaudière sur un mur à l'aide du support de montage mural fourni avec l'appareil.
  • Page 54 5 - TUYAUTERIE HYDRONIQUE 5.1 Généralités L'utilisation de produits chimiques génériques dont l'utilisation dans des installations de chauffage n'est pas • Posez la tuyauterie conformément aux normes établies spécifi quement adaptée et/ou est incompatible avec les par l'organisme compétent. matériaux de la chaudière et l'installation est interdite. AVIS Les produits chimiques de traitement doivent assurer une désoxygénation complète de l'eau et contenir des agents de...
  • Page 55 5 - TUYAUTERIE HYDRONIQUE 5.4 Raccordement du ballon pour la production Figure 7 - Diagramme de performance du d'eau chaude sanitaire ballon indirect • Le module électronique de l'unité est conçu pour gérer un Hauteur disponible en fonction de débit avec ballon ballon extérieur pour la production d'eau chaude sanitaire.
  • Page 56 5 - TUYAUTERIE HYDRONIQUE • Dimensionnez et disposez la tuyauterie d’évacuation Figure 9 - Tuyauterie d'évacuation de la pour éviter de réduire la capacité de décharge au- soupape de sécurité dessous de la capacité minimum de la vanne de décharge indiquée sur la plaque signalétique. •...
  • Page 57 5 - TUYAUTERIE HYDRONIQUE 5.6 Tuyauterie du système Figure 10 - Localisation possible de la • Les systèmes à vanne de remplissage automatique sonde de l’interrupteur de bas nécessitent un dispositif antirefoulement. niveau d’eau • Système à une seule chaudière. Considérations supplémentaires: Interrupteur de •...
  • Page 58 5 - TUYAUTERIE HYDRONIQUE Figure 11 - Tuyauterie hydronique Sortie d'eau chaude sanitaire Arrivée d'eau chaude sanitaire Alimentation de l'installation de chauffage Retour de l'installation de chauffage Vanne directionnelle 209 Alimentation ballon d'eau chaude 210 Retour ballon d'eau chaude...
  • Page 59 6 - TUYAUTERIE DE L'AIR DE COMBUSTION ET D'ÉVENT - CATÉGORIE I (CHEMINÉE) peu de coudes que possible. AVERTISSEMENT Un système d'évent commun n'est pas admis. La L'installation de la chaudière et de l'évacuation chaudière et d'autres appareils homologués peuvent doit être effectuée par un technicien d'entretien partager le même conduit de cheminée.
  • Page 60 6 - TUYAUTERIE D'AIR DE COMBUSTION ET DE VENTILATION - CATÉGORIE I (CONDUIT DE CHEMINÉE) 6.2 Dégagement minimum du tuyau d'évent Vérifi ez les fuites au niveau de l’ouverture d’échappement du coupe-tirage après 5 minutes de • Utilisez le tuyau d'évent de type B en le faisant passer fonctionnement du brûleur principal.
  • Page 61 6 - TUYAUTERIE D'AIR DE COMBUSTION ET DE VENTILATION DIRECTE DE CATÉGORIE III Chaudières à tirage induit D. Le système d'évent se terminera à au moins 0,9 m (3 pieds) au-dessus de l'arrivée d'air forcée situé L'installation de systèmes à ventilation horizontale (catégorie à...
  • Page 62 6 - TUYAUTERIE D'AIR DE COMBUSTION ET DE VENTILATION DIRECTE DE CATÉGORIE III Espacement des supports : Ne limitez pas le mouvement AVERTISSEMENT de dilatation thermique de l'évent. Le tuyau d'évent Le prolongement de l'évent vers l'extérieur ne doit doit se dilater et se contracter librement en fonction des changements de température.
  • Page 63 6 - TUYAUTERIE D'AIR DE COMBUSTION ET DE VENTILATION Assurez l'arrivée d'air de combustion et d'air de ventilation • Tout l'air extérieur. Assurez des ouvertures conformément à la section « Air pour la Combustion et la permanentes sur l'extérieur directement ou à travers des conduites.
  • Page 64 6 - TUYAUTERIE D'AIR DE COMBUSTION ET DE VENTILATION Figure 13 - Dégagements pour l'évacuation horizontale AVIS Figure 14 - Ventilation à deux tuyaux Maintenez une distance de 12” (30 cm) US, 18” (46 cm) Canada au-dessus de la limite de neige supérieure ou du sol.
  • Page 65 6 - TUYAUTERIE D'AIR DE COMBUSTION ET DE VENTILATION AVIS Figure 15 - Ventilation de la cheminée avec air ambiant simple paroi Consultez la section 6.1, paragraphes 3 à 12, page 59 de ce manuel pour une installation correcte. = Air de combustion / = Ventilation) Figure 16 - Ventilation de la cheminée avec air extérieur simple paroi...
  • Page 66 7- TUYAUTERIE D'ALIMENTATION DE GAZ Figure 17 Vanne d'arrêt de gaz principale ATTENTION manuelle en dehors de la jaquette QUE FAIRE EN CAS D'ODEUR DE GAZ de la chaudière • Ne tentez pas d'allumer un quelconque appareil. Tuyauterie avec collecteur de sédiments suggérée par le •...
  • Page 67 8 - BRANCHEMENTS ÉLECTRIQUES Figure 18 - Bornier AVERTISSEMENT Risque d'électrocution. Coupez l'alimentation électrique sur le tableau de service avant d'effectuer des connexions électriques. Le non- respect des ces instructions peut causer de graves lésions et la mort. 8.1 Généralités Reliez la chaudière à...
  • Page 68 9 - PROCÉDURE DE DÉMARRAGE 9.1 Remplissage de la chaudière avec de l’eau et AVERTISSEMENT purge d’air Risque d’asphyxie. Le monoxyde de carbone est un AVIS gaz inodore, insipide, clair et incolore, hautement toxique. La production de monoxyde de carbone ne Pour maintenir l’effi...
  • Page 69 9 - PROCÉDURE DE DÉMARRAGE 9.6 Contrôle de la combustion Figure 19 - Ports de test Gaz naturel Port de test des Mesurer le débit d’entrée. Éteindre le gaz sur tous gaz d’évent les autres appareils. • Activez quelques zones de chauffage pour dissiper la chaleur.
  • Page 70 10 - INSTRUCTIONS D’UTILISATION AVERTISSEMENT ATTENTION Le non-respect de ces instructions peut exposer QUE FAIRE EN CAS D’ODEUR DE GAZ à un incendie ou une explosion susceptible • Ne tentez pas d’allumer un quelconque appareil. d’entrainer des dommages matériels, des •...
  • Page 71: Tableau Des Commandes

    10 - INSTRUCTIONS D’UTILISATION 10.3 Contrôles pendant le fonctionnement 14 = Symbole du chauffage 15 = Brûleur en marche et puissance réelle • La chaudière est conçue pour être raccordée à un 64 = C.C. Thermomètres et manomètres ballon extérieur pour la production d’eau chaude (en option).
  • Page 72 10 - INSTRUCTIONS D’UTILISATION Commutation Été/Hiver Allumage de la chaudière Mettez l’appareil sous tension. AVIS L’activation de ce bouton permettra à votre chaudière de fonctionner. Vérifi ez qu’il n’est pas demandé à la chaudière de satisfaire des besoins en eau chaude sanitaire (ECS). Appuyez sur le bouton pendant 2 secondes.
  • Page 73 10 - INSTRUCTIONS D’UTILISATION Exclusion du ballon d’eau chaude (économie) Courbe de compensation et décalage de la courbe Le maintien de la température du ballon d’eau chaude/ Appuyez une fois sur le bouton (voir le repère 6 sur chauffage peut être exclu par l’utilisateur. S’il est exclu, la l’affi...
  • Page 74 10 - INSTRUCTIONS D'UTILISATION Appuyez de nouveau sur le bouton (voir le repère 6 sur l’affi cheur du tableau des commandes) pendant 5 secondes pour sortir du mode de réglage de la courbe parallèle. Si la température ambiante est inférieure à la valeur requise, il est conseillé...
  • Page 75 10 - INSTRUCTIONS D'UTILISATION Réglage de la pression eau installation La pression de remplissage avec l'installation froide mesurée par l'indicateur de niveau d'eau doit être d'environ 11 psi. Si la pression de l'installation chute à des valeurs au- dessous du minimum, la commande de chaudière active l'erreur F37.
  • Page 76 11 - ENTRETIEN GÉNÉRAL ET NETTOYAGE 11.1 Début de saison de chauffage 11.2 Procédure d'arrêt annuelle • Contrôlez que la surface de la chaudière soit exempte de • Suivez les instructions pour « Couper l'alimentation en matériaux de combustible, de gasoil et de toute autre gaz de l'appareil »...
  • Page 77 12 - RENDEMENTS ET CAPACITÉS Données Unité CHB100 CHB130 CHB150 Catégorie de chaudière Catégorie I-III Catégorie I-III Catégorie I-III Type de gaz Gaz naturel Gaz naturel Gaz naturel Btu/h 100000 130000 150000 Entrée maximum 0 - 2000 pieds (0 - 610 m) 29,3 38,2 44.0...
  • Page 78 Rendement AHRI (MBH) Taille AFUE (MBH) net, eau (MBH) (1)(2) (1)(3) Maximum Minimum CHB-100 31,5 73,0 CHB-130 43,5 96,0 CHB-150 50.0 110.0 1000 Btu/h (unités thermiques britanniques par heure) La capacité de chauffage et l'effi cacité de l'utilisation annuelle de combustible (AFUE) reposent sur les procédures de test du Ministère de l'Énergie.
  • Page 79 12 - RENDEMENTS ET CAPACITÉS Schémas Diagrammes pression - puissance Colonne d'eau pression de gaz dans collecteur “wc 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 44 45 Pertes de charge / tête de circulateurs 20,00 18,00...
  • Page 80 13 - PANNES Diagnostic La chaudière est équipée d'un système d'autodiagnostic sophistiqué. En cas de dysfonctionnement de la chaudière, l'écran clignote et affi che le code d'erreur. Certaines anomalies provoquent l'arrêt permanent (signalées par la lettre « A ») : pour rétablir le fonctionnement, appuyez simplement sur le bouton RESET pendant 1 seconde ou RESET ;...
  • Page 81 SCHÉMA DE CÂBLAGE *155 kOhm *370 138 - Capteur extérieur en option *138 kOhm 155 - Capteur ballon indirect en option 370 - Interrupteur niveau d'eau bas installé sur place 120V 60Hz DBM34A +15V 307 - DEUXIÈME CIRCULATEUR DE CHAUFFAGE INSTALLÉ SUR PLACE G L1 Repère...
  • Page 82 LISTE DES PIÈCES DÉTACHÉES - CHB CODE Réf. Description Model FE3980B830 ENVELOPPE "CTR" CHB-100/130 FE3980B990 ENVELOPPE "CTR" CHB-150...
  • Page 83 LISTE DES PIÈCES DÉTACHÉES - CHB CODE Réf. Description FE3980C200 KIT BOÎTIER DE COMMANDE FE3980B851 KIT PANNEAU DE COMMANDE DBM34A FE3980C210 KIT COUVERCLE AVANT « CTR » FE3980B840 KIT INDICATEUR PRESS.TEMP. FE3980B861 KIT CÂBLAGE FE3980C220 KIT MONO CABLE ÉL.
  • Page 84 LISTE DES PIÈCES DÉTACHÉES - CHB...
  • Page 85 LISTE DES PIÈCES DÉTACHÉES - CHB Réf. CODE Description CHB 100 CHB 130 CHB 150 KIT JEU DE JOINTS FE3980B870 FE3980B870 FE3980C000 ÉCHANGEUR DE CHALEUR MONO FE3980C230 FE3980B880 FE3980C030 KIT DE JOINTS FE3980C010 FE3980C010 FE3980C010 KIT DE CLIPS D18 FE3980C020 FE3980C020 FE3980C020 CAPTEUR DE TEMP.
  • Page 86 LISTE DES PIÈCES DÉTACHÉES - CHB...
  • Page 87 LISTE DES PIÈCES DÉTACHÉES - CHB Réf. CODE Description CHB 100 CHB 130 CHB 150 KIT JEU DE JOINTS FE3980B930 FE3980B930 FE3980B930 KIT COUDE DE SORTIE GAZ DE COMBUSTION FE3980C160 FE3980C160 FE3980C160 JOINT DE VENTILATEUR FE3980C100 FE3980C100 FE3980C100 KIT VENTILATEUR FE3980C250 FE3980B940 FE3980B940...
  • Page 88 REMARQUES...
  • Page 89 REMARQUES...
  • Page 92 ECR International, Inc 2201 Dwyer Avenue, Utica NY 13501 web site: www.ecrinternational.com...

This manual is also suitable for:

Chb-130Chb-150

Table of Contents