Set-Up Gas Supply - Valor 1500INO (NG) Installation & Owners Manual

Dv zc gas fireplace for outdoor use
Hide thumbs Also See for 1500INO (NG):
Table of Contents

Advertisement

QUALIFIED
INSTALLER

Set-up Gas Supply

The gas supply inlet con-
nection is a 3/8" NPT male
connector located on the left
hand side of the fi rebox.
The unit is supplied with a
stainless steel fl ex
line to allow the ap-
pliance to be discon-
nected for service.
An individual shut-off
valve (not supplied) is
required on the sup-
ply line ahead of the
fl ex connector.
Use only new black
iron or steel pipes
or copper tubing if
acceptable—check
local codes. Note
that in USA, copper tubing must be internally tinned for
protection against sulfur compounds.
Unions in gas lines should be of ground joint type.
The gas supply line must be sized and installed to
provide a supply of gas suffi cient to meet the maximum
demand of the appliance without undue loss of pressure.
Sealant used must be resistant to the action of all gas
constituents including LP gas. Sealant should be ap-
plied lightly to male threads to ensure excess sealant
does not enter gas lines.
Pressure test the supply line for leaks.
The appliance and its individual shut-off valve must be
disconnected from the gas supply piping system during
any pressure testing of that system at test pressures in
excess of 1/2 psig (3.5 kPa).
The appliance must be isolated from the gas supply
piping system by closing its individual manual shut-off
valve during any pressure testing of the gas supply pip-
ing system at test pressures equal to or less than 1/2
psig (3.5 kPa).
Failure to either disconnect or isolate the appliance
during pressure testing may result in regulator or valve
damages and void the warranty. Consult your dealer in
case of damages.
Pressure Test Points
The minimum supply pressure is given in the section
Specifi cations of this manual—page 15.
36
X
Gas line
access hole
2-1/2" (64 mm)
Front
diam.
4 "
( 1 0
of the
2 m
appliance
m )
3-3/4"
(95 mm)
Left side view
Installation
Appliance front
outer casing
Valve Assembly
All piping and connections must be tested for leaks af-
ter installation or servicing. All leaks must be corrected
immediately.
When testing for leaks:
• Make sure that the appliance is turned off.
• Open the manual shut-off valve.
• Test for leaks by applying a liquid detergent or soap so-
lution to all joints. Bubbles forming indicate a gas leak.
Never use an open fl ame to check for leaks.
Correct any leak detected immediately.
The pressure test tapping locations are shown in the
fi gure at right. An internal regulator within the valve con-
trols the burner manifold pressure. The correct pressure
range is shown in the table in section Specifi cations of
this manual on page 15. The pressure check should be
made with the burner alight and at its highest setting.
See Lighting Instructions section for full operating details
on page 12.
Window
Receiver
Manifold Pressure
Adjustment behind
Plastic Cap
Control Valve
Manifold
Test
Pressure
Pressure Testing
Flexible
connector
supplied
with unit
Valve Inlet
Pressure

Advertisement

Table of Contents
loading

This manual is also suitable for:

1500ipo (lpg)

Table of Contents