Console Installation On Ac Performance Plus - Schwinn MPower Echelon2 Console Installation Manual

Hide thumbs Also See for MPower Echelon2 Console:
Table of Contents

Advertisement

Console Installation on AC Performance Plus

1. Insert batteries into console. (Figure 31)
2. Remove handlebars from bike and place on a sturdy working surface.
3. Grab the console-to-RPM cable and note which end has the 2-pin connector.
4. Insert the end of cable with the 2-pin connector into the opening at the top of the handlebar
post. Feed the cable through, with one section of coiled cable being inside the tube, and
one section of coiled cable being outside the tube. The end of the cable should just be
poking out of the end of the tube. (Figure 32 and Figure 33)
Figure 32
5. Place the handlebar back on the bike.
6. Feed the end of the cable out of the end of the head tube. Wear heavy-duty protective
gloves when pulling the end of the cable out of the head tube as there may be sharp edges
inside the head tube. (Figure 34)
14 |
P a g e
Figure 31
M P o w e r E c h e l o n 2 I n s t a l l a t i o n G u i d e
Figure 33

Advertisement

Table of Contents
loading

Table of Contents