20 - MAINTENANCE SCHEDULE - APOLLO GATE OPENER

Alarm
Active the primary (inherent)reverse system by blocking the gate with a solid object. The
gate should reverse momentarily then stop. Restart the gate snd block again with a solid
object. The gate should reverse momentarily, then stop, and go into hard shutdown with
an alarm
Backup System
If operator is equipped with option DC backup system, check to be sure the system
opens the gate upon loss of AC power
Battery
If operator is equipped with option DC backup system, check the batteries for any
leakage or loose connections. Batteries should be replaced every two years
Fire Dept
Check emergency vehicle access device for proper operation
Reverse System
Check that the gate reverses on contact with an object in both the opening and closing
cycles
Check vehicular reverse and shadow loops for proper operation
Loop(s)
Release
Check manual release for proper operation
Complete
Overall Check: Complete check of gate and gate operating system
Mounting Hardware
Check screws and nuts
Rain Drain
Remove top lid and sweep out any debris or dust that may have accumulated.
Every 6 months

21 - INSTALLATION DRAWING (1)

POST
Figure 29 - INSTALLATION DRAWING
20
Table 2
Gate Arm Attachment
Sample installation
LONG ARM
COMPLETE
POST
14"
SHORT ARM
24"
BASIC

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 4300 SW and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

4500 sw

Table of Contents