Ubiquiti PowerBeam M5 PBE-M5-620 Quick Start Manual page 7

High-performance integrated innerfeed airmax bridge
Table of Contents

Advertisement

5. Attach two Hex Head Bolts, two Lock Washers, and two Flat
Washers to the bottom of the Mounting Bracket. Ensure that
there is a gap of 8 mm between each Flat Washer and the
Mounting Bracket.
Note:
installed between the Hex Head Bolt and Flat Washer.
Flat Washer
Lock Washer
Hex Head Bolt
Ensure that each Lock Washer is always
8 mm

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power beam m5 pbe-m5-620

Table of Contents