Step 2 Framing The Fireplace - Legend DV36NG Owner's Manual

Direct-vent gas fireplace
Table of Contents

Advertisement

Step 2. Framing the Fireplace
Fireplace framing can be built before or after the fireplace is set in place. Framing should be
positioned to accommodate wall coverings and fireplace facing material.
UNIT ASSEMBLY PRIOR TO INSTALLATION
The Top Facing Support, the Side Nailing Strips and the 2 Top Standoffs must be correctly
positioned and attached to the top before unit is slipped into position.
(Field finished)
TOP STANDOFF ASSEMBLY
The top standoffs packed separately from the fireplace., you need to fold it to the right angle and
mount in right position.
1) Remove the standoffs from packing.
2) Take each standoff and bend into the correct shape. Bend it until the screw holes in the standoff
and the pre-punched screw holes on the fireplace top line up.
3) Attach the standoff securely to the top with 4 screws per standoff.
The side and back standoff is also packed separately in carton, you should find it and attach the
standoff securely to the side and back of fireplace with 4 screws per standoff.
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dv36

Table of Contents