General Layout - Baxi Barcelona Installation And Servicing Instructions

Wall mounted powered flue condensing boiler gas fired central heating unit
Hide thumbs Also See for Barcelona:
Table of Contents

Advertisement

2.0
General Layout – page 5
2.1
Layout (Figs. 3,4 & 5)
1.
Wall Plate
2.
Flue Elbow
3.
Heat Exchanger
4.
Burner
5.
Air Box
6.
Fan Protection Thermostat
7.
Fan Assembly
8.
Condensate Trap
9.
User Interface (optional timer available)
10.
Gas Tap
11.
Gas / Air Ratio Valve
12.
Electronics Housing
13.
Transformer
14.
Flow Pipe Connection
15.
Return Pipe Connection
16.
Flow Temperature Safety Thermostat - Black
17.
Flow Temperature Thermistor - Red
18.
Flow Switch (dry fire protection)
2.2
Optional Extras
KIT
FLUE EXTENSION KITS (110/70)
Flue Extension 0.25M
Flue Extension 0.5M
Flue Extension 1 M (Use two kits for 2M etc.)
Flue Bend x 2 – 45º (Reduce overall length
of flue by 0.5m when fitting this bend)
Flue Bend – 90º (Reduce Overall length of
flue by 1m when fitting each bend)
VERTICAL FLUE (110/70)
Vertical Flue Terminal
Vertical Boiler Connection
CONTROL ACCESSORIES
Integral Electronic Twin Channel Timer Kit
PART Nº
241692
241694
241695
241689
241687
242802
242886
242834

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents