Installation - Baxi Barcelona Installation And Servicing Instructions

Wall mounted powered flue condensing boiler gas fired central heating unit
Hide thumbs Also See for Barcelona:
Table of Contents

Advertisement

8.0
Installation – page 16
Fig. 20
Fig. 21
Fig. 22
Check Site Requirements (section 7) before
commencing.
8.1
Initial Preparation
The gas supply, gas type and pressure must be checked
for suitability before connection (see Section 7.6).
NOTE: If the boiler wall plate is to be pre-hung, follow both
these instructions and those on the boiler pack.
1.
Remove the fixing template (Fig. 20) from the carton.
2.
After considering the site requirements (see Section 7.0
) position the template on the wall ensuring it is level
both horizontally and vertically.
3.
Mark the position of the centre hole for the wall plate
(Fig. 20).
4.
Mark the centre of the flue hole (rear exit). For side exit,
mark as shown (Fig. 21). If required, mark the position
of the gas and water pipes. Remove the template.
5.
Cut the hole for the flue (minimum diameter 125mm,
see table for wall thicknesses and flue diameters).
6.
Drill and plug the wall as previously marked. Secure the
wall plate using the centre hole.
7.
Ensuring the wall plate is level both horizontally and
vertically, drill and plug at least 4 securing positions at
the top and bottom through the wall plate. Utilising the
slots available ensure the wall plate is square and
secure to the wall (Fig. 22).
8.
Loosely route the condensate discharge pipe to the
lower left hand side of the wall plate.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents