Download Print this page

Okina B00PVFKGS0 User Manual page 19

16-channel-1080p-h-264-realtime-recording

Advertisement

Step1: enter into system configurationschedule configurationschedule; refer to Fig 4-14:
Step2: select channel, double-click and a dialog box will pop-up as Fig 4-15, user can edit week schedule:
① Click "add" button to add a certain day schedule; click "delete" button to delete the selected schedule;
Copy: user can copy the specify schedule to other dates.
Click "OK" button to save the setting, click "Exit" button to exit current interface.
② User can apply the schedule setting of certain channel to other or all channels, just only select channel
and click "Copy" button.
Step3: click "default" button to resort default setting; click "apply" button to save the setting; click "exit"
button to exit current interface.
3.4.2 Motion
Step1: enter into system configurationschedule configurationmotion; refer to Fig 4-16:
Step2: the setup steps of motion are familiar with schedule; user can refer to 4.4.1 Schedule for details.
Fig 4-14 schedule configuration-schedule
Fig 4-15 schedule-week schedule
Fig 4-16 schedule configuration-motion
19

Advertisement

loading