Page 1
Aztec Classic Electric Boilers CLASSIC 2, 6, 9, 11 & 12KW BOILER INSTALLATION, OPERATION AND SERVICING INSTRUCTIONS Please read these instructions carefully before installing and operating this appliance...
Aztec Classic Electric Boilers CONTENTS 1. Health & Safety 2. Pre-Installation Notes 2.1 Ventilation and Siting 2.2 Power Supply and Wiring 2.3 System 3. After Sales Service Information 3.1 How to Report a Fault 3.2 Technical Assistance 4. Introduction 5. Users Instructions 6.
Aztec Classic Electric Boilers temperatures. Refer to Ventilation Requirements (Page 7) for 1. Health & Safety further details. Ensure that the area surrounding the boiler is kept free of items Information for the Installer and Service Engineers which would impede the good ventilation of the appliance (e.g. towels, linen, etc.).
The installation and commissioning dates and the details of any annual services. The Trianco Aztec boiler has been designed and constructed to give years of trouble free service and these instructions are provided to assist you in obtaining the best performance with the least trouble Appliance Serial No:___________________ and cost.
Aztec Classic Electric Boilers Set the time switch/programmer (if fitted) to the times and If the boiler and central heating is shut down for many hours during programs required. cold weather, the water may be in danger of freezing. The boiler The boiler will now operate automatically, cutting in and out incorporates a frost thermostat.
Aztec Classic Electric Boilers enable the removal of the front casing. In both cases, where any 7. Technical Specification additional equipment like a hot water cylinder or system controls are to be fitted after the boiler has been installed, attention should MODEL Aztec Aztec...
Aztec Classic Electric Boilers Fitting Strain 9-12kW 1089 Relief Bushes 1109 1073 MINIMUM CLEARANCES: FRONT – 150mm From other fixed equipment: TOP – 100mm BOTTOM – 100mm L/H SIDE – 50mm R/H SIDE – 100mm Strain Relief NOTE: APPROXIMATELY 750mm WILL Bushes BE REQUIRED AT THE FRONT OF THE APPLIANCE TO ENSURE ADEQUATE...
Page 8
Aztec Classic Electric Boilers The water system must be thoroughly flushed out with cold water Capacity of Expansion Vessel without the pump in position. Refit the pump and fill the system. Where design information is not complete the following chart (Page Vent all air from the system.
Aztec Classic Electric Boilers Min. Flow Ø35mm Ø28mm Ø28mm Rate Ø22mm Ø22mm Ø22mm FIG 8 Safety valve setting (bar gauge) 3 bar Ø22mm Ø22mm Ø22mm Vessel charge and initial system Flow Drain pressure (bar gauge) Total water content of system Vessel volume Ø22mm Ø28mm...
Aztec Classic Electric Boilers Open vented Auto air vent Open Vent System F&E Tank arrangement Ø22mm DHW Cylinder Auto air vent Ø15mm 3 port valve PUMP Service valve FLOW Bypass must dissipate heat and be 22mm diameter min x 1.5m ALTERNATIVE Auto bypass...
Aztec Classic Electric Boilers 10. Wiring Instructions Note: RCD UNIT can be used as the isolating switch if mounted close enough to the boiler. ALL ELECTRICAL WORKMUST BE CARRIED OUT IN ACCORDANCE Miniature circuit breakers (MCB) MUST be fitted between RCD unit WITH CURRENT IEE WIRING REGULATIONS.
Page 12
Aztec Classic Electric Boilers Wiring Instructions (continued) 230V SUPPLY GREY ORANGE PLEASE NOTE: THIS LIVE SUPPLY 3 Phase Supply Connections for 2 or more Boilers CALL TERMINAL CAN ONLY RE USED FOR THIS MAINS SUPPLY CABLES (BOILER) WIRING CONFIGURATION. Connect each boiler to each phase. OTHER RESULT CONTROL SIGNAL...
Page 13
Aztec Classic Electric Boilers Orange Blue Brown Blue Brown Blue Brown...
Page 14
Aztec Classic Electric Boilers Orange Orange Blue Brown Blue Brown Blue Blue Brown...
Page 15
Aztec Classic Electric Boilers Black Orange Blue Brown Blue Brown Blue Blue Brown...
Page 16
Aztec Classic Electric Boilers ELEMENT 4 ELEMENT 3 ELEMENT 2 ELEMENT 1 ELEMENT 4 ELEMENT 3 ELEMENT 2 ELEMENT 1 ...
Aztec Classic Electric Boilers Remove 4 fixing screws securing front casing in position. 11. Servicing Instructions Slide top casing upwards this will allow front casing to slide forward. To ensure reliable operation of your Aztec electric boiler, it is IMPORTANT: All electrical connections should be checked. Loose recommended that you have your boiler serviced once a year.
Aztec Classic Electric Boilers Mains Inlet Wring If the mains supply to the boiler is wired incorrectly on the inlet terminal block. Check polarity. PCB Damage Inspect the LED lights and the boiler temperature control adjuster for any damage to connections to the PCB controller. Voltage Drop If the voltage drops below 207 volts.
Page 19
Aztec Classic Electric Boilers NO HEAT – PERMANENT GREEN LIGHT IS THE PROGRAMMER TURNED ON I.E. CALL SIGNAL? CHECK IS CALL WIRE LIVE I.E. LINE ELECTRIC VOLTAGE? SYSTEM CHECK CIRCUIT EXTERNAL CONTROLS ARE CALLING FOR HEAT IS THE HEAT EXCHANGER GETTING UP TO TEMPERATURE –...
Page 20
Aztec Classic Electric Boilers FLASHING RED LIGHT ARE CABLES AND REPLACE CONNECTIONS CABLES IS THERE IS THERE POWER CONTINUITY TO ALL ACROSS THE ELEMENTS? ELEMENTS? ARE JUMPERS SET DOES THE PUMP CORRECTLY? GIVE CORRECT FLOW? REPLACE ELEMENT CHANGE PCB OR HEAT CHANGE PCB EXCHANGER...
Page 21
Aztec Classic Electric Boilers PERMANENT RED LIGHT IS INCOMING POWER SUPPLY OK? DOES THE BOILER GO STRAIGHT TO DOES THE BOILER GO RED LIGHT? FROM GREEN TO AMBER TO RED? HAS THE HIGH LIMIT STAT TRIPPED? RE-SET HIGH LIMIT STAT ARE THE LIMIT IS THE SYSTEM STAT...
Page 22
Aztec Classic Electric Boilers NO GREEN LIGHT IS INCOMING POWER SUPPLY OK? HAS THE FUSE HAS THE RCD CHANGE FUSE RESET RCD BLOWN ON THE TRIPPED? AND CHECK PCB? PUMP IS THERE CHANGE PCB POWER TO LIVE & NEUTRAL? CHECK SYSTEM WIRING...
Need help?
Do you have a question about the Aztec CLASSIC 2KW and is the answer not in the manual?
Questions and answers