IDEAL LOGIC + Combi 24 Installation And Servicing page 10

Hide thumbs Also See for LOGIC + Combi 24:
Table of Contents

Advertisement

1
BOILER DIMENsIONs, sERVICEs & CLEARANCEs
The boiler connections are made on the boiler connection tails.
Refer to Frame 24.
The following minimum clearances must be maintained for
operation and servicing.
Additional space will be required for installation, depending upon
site conditions.
side and Rear Flue
a. Provided that the flue hole is cut accurately, e.g. with a core
drill, the flue can be installed from inside the building where
wall thicknesses do not exceed 600mm (24"). Where the
2.5
43
10
2.5
from case
Side flue
dim. A
65
57
38
39
65
Gas Inlet
general
space into which the boiler is going to be installed is less
than the length of flue required the flue must be fitted from
the outside.
Installation from inside ONLy
b. If a core boring tool is to be used inside the building the
space in which the boiler is to be installed must be at least
wide enough to accommodate the tool.
395
700
Front clearance
The minimum front clearance when built in to a cupboard is 5mm
from the cupboard door but 450mm overall clearance is still
required, with the cupboard door open, to allow for servicing.
*
Bottom clearance
Bottom clearance after installation can be reduced to 5mm.
This must be obtained with an easily removable panel, to
enable the consumer to view the system pressure gauge,
and to provide the 100mm clearance required for servicing.
Ideal Logic
all dimensions in mm
+
Combi -
Installation and Servicing

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logic + combi 35Logic+ combi 30

Table of Contents