Carbonation Tank; Pre Delivery Inspection Procedures (Pdi) - WaterLogic WL3 Firewall Technical Manual

Table of Contents

Advertisement

Carbonation Tank

WL3 Technical Manual - Version 1, July 2014
12
Pre Delivery
Inspection Procedures (PDI)
CAUTION:
Only competent trained technicians should work on Waterlogic products.
Waterlogic units may weigh over 25KG. We recommend caution when lifting.
Packing materials could present a trip hazard. Keep them off the floor.
Take care not to allow the power lead to get wet. If the lead gets wet it must not
be used.
CO
gas cylinders used for sparkling units are under high pressure and should
2
be handled carefully and all safety instructions should be followed.
For Hot and Cold units, omit section 8, 10, 12.
For Cold and Sparkling units, omit section 13, 15.
13

Advertisement

Table of Contents
loading

Table of Contents