Mitsubishi Heavy Industries SRK20ZJX-S Service Manual page 75

Hide thumbs Also See for SRK20ZJX-S:
Table of Contents

Advertisement

CAUTION- HIGH VOLTAGE
High voltage is produced in the control box. Don't touch
electrical parts in the control box for 5 minutes after the
unit is stopped.
Color Marks
Power supply
Mark
Color
1 Phase
BK
Black
220-240V 50Hz
BL
Blue
BR
Brown
TB1
RD
Red
WH
White
L
OR
Orange
N
BR
Brown
YE
Yellow
Y/G
Yellow/Green
TB2
1
2
UNIT A
3
TB3
1
2
UNIT B
3
TB4
1
2
UNIT C
3
TB5
1
2
UNIT D
3
◆Power source and serial
signal inspection
① to ②: AC 220/230/240V
② to ③ : Normal if the voltage
oscillates between DC 0
and approx. 20V
FUSE
250V 20A
BK
BK
R
IN
WH
WH
S
IN
Y/G
G1
Y/G
G
Y/G
BK
WH
CNA
RD
Y/G
BK
WH
CNB
BR
Y/G
BK
WH
CNC
BL
Y/G
BK
WH
CND
YE
Y/G
CNHEAT
CN20S
G2
Y/G
Y/G
WH
WH
RD
20S
HEATER
CNMAIN
PWB 2(SUB)
CNEEV1
CNEEV2
CNTH
RD
BL
GN
M
M
M
M
EEV
EEV
EEV
EEV
TH4
A
B
C
D
◆Inspection power transistor
Remove the fasten terminal and test
output voltage
BK
R
R
O
WH
S
S
O
T1
WH
S-1
S-2
T2
RD
C-2
C-1
5
CNSUB
2
U
CN20V
CN20V
V
W
PWB 1(MAIN)
CNFAN
CNTH
2
2
2
2
◆Inspection of outdoor
TH1 TH2 TH3
YE
R
OR
RD
WH
M
3~
BK
CM
M
FMo
fan motor
See page 109.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents