Mitsubishi Heavy Industries SRK20ZJX-S Service Manual page 61

Hide thumbs Also See for SRK20ZJX-S:
Table of Contents

Advertisement

CAUTION- HIGH VOLTAGE
High voltage is produced in the control box. Don't touch
electrical parts in the control box for 5 minutes after the
unit is stopped.
Color Marks
Mark
Color
BK
Black
Power supply
BL
Blue
1 Phase
RD
Red
220-240V 50Hz
WH
White
OR
Orange
TB1
BR
Brown
YE
Yellow
Y G
Yellow Green
TB2
UNIT A
UNIT B
UNIT C
Power source and serial
signal inspection
to
: AC 220/230/240V
to
: Normal if the voltage
oscillates between DC 0
and approx. 20V
FUSE
250V 15A
250V 20A
BK
BK
R
L
IN
WH
WH
S
N
IN
Y G
G1
Y G
G
Y G
BK
1
WH
2
CNA
RD
3
BK
1
WH
2
CNB
BR
3
BK
1
WH
2
CNC
BL
3
CNHEAT
CN20S
G2
Y G
WH
RD
HEATER
20S
CNMAIN
PWB 2 SUB
CNEEV1
CNEEV3
CNTH
2
WH
RD
BL
M
M
M
TH4
EEV
EEV
EEV
A
B
C
Inspection of resistance value of sensor
Inspection of electronic
Remove the connector and check the resistance value.
expansion valve
See the section of sensor characteristics on page 52.
See page 62.
Inspection power transistor
Remove the fasten terminal and test
output voltage
BK
R
R
O
WH
S
S
O
T1
WH
S-1
S-2
T2
RD
C-1
C-2
5
CNSUB
2
U
CN20V
CN20V
V
W
PWB 1 MAIN
CNFAN
CNTH
2
2
2
TH1 TH2 TH3
YE
R
OR
RD
WH
M
3
BK
CM
M
FMo
Inspection of outdoor
fan motor
See page 62.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents