Mitsubishi Heavy Industries SRK20ZJX-S Service Manual page 73

Hide thumbs Also See for SRK20ZJX-S:
Table of Contents

Advertisement

CAUTION- HIGH VOLTAGE
High voltage is produced in the control box. Don't touch
electrical parts in the control box for 5 minutes after the
unit is stopped.
Color Marks
Mark
Color
Power supply
BK
Black
1 Phase
RD
Red
220-240V 50Hz
WH
White
OR
Orange
BR
Brown
TB1
YE
Yellow
Y/G
Yellow/Green
TB2
UNIT A
TB3
UNIT B
◆Power source and serial
signal inspection
① to ②: AC 220/230/240V
② to ③ : Normal if the voltage
oscillates between DC 0
and approx. 20V
FUSE
250V 15A
BK
BK
R
L
IN
WH
WH
S
N
IN
Y/G
G1
Y/G
G
Y/G
1 BK
WH
2
CNA
RD
3
BK
1
WH
CNB
2
BR
3
CNHEAT
CN20S
WH
RD
HEATER
20S
PWB 2(SUB)
G2
CNEEV1
Y/G
WH
RD
M
M
EEV
EEV
A
B
◆Inspection power transistor
Remove the fasten terminal and test
output voltage
BK
R
R
O
WH
S
S
O
T1
WH
S-2
S-1
T2
RD
C-1
C-2
5
CNMAIN
CNSUB
2
U
CN20V
CN20V
V
W
PWB 1(MAIN)
CNFAN
CNTH
CNTH
2
2
2
2
TH1 TH2 TH3
TH4
YE
R
OR
RD
WH
M
3~
BK
CM
M
FM0
◆Inspection of outdoor
fan motor
See page 109.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents