Mitsubishi Heavy Industries SRK20ZJX-S Service Manual page 118

Hide thumbs Also See for SRK20ZJX-S:
Table of Contents

Advertisement

FUSE
250V 15A
250V 20A
TB1
BK
BK
R
L
IN
POWER
WH
WH
S
SUPPLY
N
IN
Y G
G1
Y G
G
Y G
TB2
BK
1
WH
CNA
UNIT A
2
RD
3
BK
1
WH
UNIT B
2
CNB
BR
3
BK
1
WH
UNIT C
2
CNC
BL
3
CNHEAT
CN20S
WH
RD
HEATER
20S
Color Marks
Mark
Color
Mark
Color
BK
Black
BR
Brown
BL
Blue
YE
Yellow
RD
Red
Y G
Yellow Green
WH
White
OR
Orange
WIRING DIAGRAM
S-1
C-1
CNMAIN
CN20V
PWB 2 SUB
G2
CNEEV1
CNEEV3
CNTH
Y G
2
WH
RD
BL
M
M
M
TH4
EEV
EEV
EEV
A
B
C
Meaning of Marks
Item
Description
CNA-CN20S
Connector
20S
4 Way valve coil
CM
Compressor motor
EEV A,EEV B
Electric expansion valve
EEV C
coil
FMo
Fan motor
HEATER
Crank case heater
BK
R
R
O
WH
S
S
O
YE
T1
WH
S-2
R
OR
T2
RD
C-2
5
CNSUB
2
CN20V
U
RD
V
WH
M
3
W
BK
CM
PWB 1 MAIN
M
CNFAN
FMo
CNTH
2
2
2
TH1
TH2
TH3
Item
Description
R
Reactor
TB1,TB2
Terminal block
Th1
Heat exchanger sensor
outdoor unit
Th2
Outdoor air temp. sensor
Th3
Discharge pipe temp. sensor
Th4
Suction pipe temp. sensor
Indication lamp
Color
Function
Led e
1
Red
Warning lamp
Self diagnosis function by led e
1 Time flash
Current cut
2 Time flash
Trouble of outdoor unit
3 Time flash
Over current
4 Time flash
Transmission error
5 Time flash
Over heat of compressor
6 Time flash
Error of signal transmission
7 Time flash
Lock of compressor
8 Time flash
Sensor error
Except discharge pipe sensor
Light on
Outdoor fan motor error
Four sec light
and
Discharge pipe sensor error
four sec off
Caution
When the compressor does not run Immediately after
hitting on the button,wait for 5 to 10 minutes. There is
possibility of delayed start.
High voltage is produced in the control box. don't touch
electrical parts in the control box for 5 minutes after
cutting power supply.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents