Operation; Putting The Engine Into Operation After Extended Out-Of-Service Periods; Months) - MTU 8 V 2000 M84 Operating Instructions Manual

Mtu 8 v 2000 m84; 10 v 2000 m84 diesel engines
Table of Contents

Advertisement

4 Operation

4.1 Putting the engine into operation after extended out-of-
service periods (>3 months)
Preconditions
☑ Engine is stopped and starting disabled.
☑ MTU Fluids and Lubricants Specifications (A001061/..) are available.
Putting the engine into operation (out-of-service period > 3 months)
Item
Engine
Lube oil system
Fuel prefilter
Fuel prefilter, pressure
gauge
Fuel system
Raw-water pump (if located
above waterline)
Coolant circuit
Coolant circuit
Coolant circuit
Measure
Depreserve (→ MTU Fluids and Lubricants Specifications A001061/..).
Check engine oil level (→ Page 96).
Fill with fuel (→ Page 89).
Align adjustable pointer with position of pressure indicator (→ Page 85).
Vent (→ Page 82).
Prime (approx. 3 to 4 liters).
Filling point (→ Page 103).
If engine is out of service for more than one year, change engine coolant
(→ Page 110).
Check coolant level (→ Page 109).
Heat engine coolant with coolant preheating unit.
MS150062/01E 2012-01 | Operation | 39

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

10 v 2000 m84

Table of Contents