Unit Assembly Prior To Installation; Standoff Assembly; Nailing Strips - Outdoors Outdoor 42 Owners & Installation Manual

Gas fireplace
Table of Contents

Advertisement

The 6 Standoffs must be correctly positioned and attached before unit is slid
into position.

STANDOFF ASSEMBLY

The standoffs are shipped in a flat position and must be folded into shape
and attached.
1) Remove the standoffs from the fireplace.
2) Take each standoff and bend into the correct shape. Bend up at the bend
lines until the screw holes in the standoff and the pre-punched screw holes
on the fireplace top line up.
3) Attach the standoff securely to the unit with 2 screws per standoff (on
opposite corners).
Note:
Depending on the material used for finishing, the nailing strips must
be set accordingly so that the finished material is always at the 1-1/2"
edge of the flange.
OD42 Outdoor Gas Fireplace

UNIT ASSEMBLY PRIOR TO INSTALLATION

Standoffs installed.

NAILING STRIPS

The nailing strips come attached to the unit. There is 1 plate on each side
and 1 on the top that can be folded out as required.
Secure the top and side nailing strips to the framing.
Finished
Nailing Strip
Material
Position
1/2"
1"
1-1/2"
0" (flush)
installatiOn
Nailing Strips
1"
Nailing Strip
1" Forward
Unit
1/2"
Nailing Strip
½" Forward
Unit
Nailing Strip
Flush w/unit
Factory Set
Unit
15

Advertisement

Table of Contents
loading

Table of Contents