Preparation 1 - Turning Power On; Turning Power On; Turning Power Off - Toshiba e-studio 223 Operator's Manual For Copying Functions

Hide thumbs Also See for e-studio 223:
Table of Contents

Advertisement

Preparation 1 - Turning Power ON

Turning power ON

1
Press the power switch to "
The equipment starts warming itself up. The warm-up time takes approx. 25 seconds.
When the warm-up has finished, the [START] lamp is lit to show that the equipment is
ready for copying.
If you press the [START] button with an original placed while the warm-up is still continu-
ing, copying automatically starts after it has finished. This is called auto job start. When
the job is reserved, the [START] lamp blinks to show you the current status.
However, this function cannot be accessed while "0" is blinking on the LED display
(approx. 15 seconds).
2
Key in the access code if the equipment is managed under the
access code function.
Key in the 3-digit access code, and then press the [START] button. Then the equipment
is ready for copying.
If the access code function is enabled, press the [FUNCTION CLEAR] button after
any operation has been finished to prevent unauthorized use of the equipment.
For the details of the access code setting, ask your service technician.

Turning power OFF

Press the power switch to "
" (ON) side.
" (OFF) side.

Preparation 1 - Turning Power ON

31

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E-studio 243

Table of Contents