Water Piping - Space Heating - IBC DC 23-84 Installation And Operating Instructions Manual

Dc series combi boiler
Table of Contents

Advertisement

DC SERIES COMBI BOILERS DC 23-84, DC 29-106, DC 33-124, DC 33-160
1.6

WATER PIPING - SPACE HEATING

1.6.1 General Piping Considerations
The DC series boilers include a factory installed, integral Grundfos UPS 15/58
heating pump. The pump is designed to provide adequate flow through the boiler
and near boiler piping. The pump is pre wired and factory set to speed #3.
Figure 22: Overview of piping options
Primary/secondary piping or the use of a buffer tank / hydraulic separator is
recommended for maximum flexibility in multi zone/load applications. Piping
loads in parallel is only acceptable in systems where the minimum flow rate is
guaranteed to be higher than the minimum for the boiler and the boilers pump is
adequate to provide the required flow rate and pump head for the system.
There are some important details to consider however, and this section of the
Installation and Operating Manual will walk you through them so you can enjoy a
trouble-free installation.
Table 5
1-19
INSTALLATION

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dc 29-106Dc 33-124Dc 33-160Hc 13-50

Table of Contents