7. Mounting

Mount ServiceTrack using construction methods and hardware appropriate for your site. Install the conduit and pull the
conductors as specified above or according to the engineer's design.
Fig.7 Enclosure Dimensions
12.75

CONNECTION AND WIRING INSTRUCTIONS

1. Phase, Neutral, and Ground Connections
Phase, Neutral* and Ground: Following all applicable National Electrical Code standards as well as state and local codes,
connect the phase, neutral* and ground conductors to ServiceTrack's lugs. Ensure that the conductor lengths are kept as
short and straight as possible. The lugs can be rotated to face in the direction of the cable exit by loosening the nut on the
input terminal lugs in the suppressor. Tighten all lugs to 20 in-lb (2.2 Nm). On all high-leg delta systems the high-leg (color-
coded orange according to NEC) conductor must be connected to the Phase B terminal of the suppressor.
*DELTA-connected ServiceTrack does not have a neutral conductor.
SERVICETRACK
INSTALLATION, OPERATION AND MAINTENANCE MANUAL
ENCLOSURE SIZE
Inches
13.69H
Centimeters
34.77H
12.40
10.00
12.40
12.40W
7.94D
31.50W
20.17D
7.94
Ø0.31
0.34
4 PLCS.
4 PLCS
13.69
7