Adding Body Reflectors - Space-Ray PTS 40-N7/L7 Installation And Operation Instructions Manual

Infrared radiant tube heater two stage push through system (positive pressure)
Table of Contents

Advertisement

MODEL
MODEL
MODEL
MODEL
2 Ft. Turbulator Sections
2 Ft. Tur
2 Ft. Tur
2 Ft. Tur
PTS/U 40/25
PTS/U 50/30
PTS/U 75/50
PTS/U 100/65
PTS/U 125/80
PTS/U 150/100
PTS/U 175/110
PTS/U 200/125
10.3)

ADDING BODY REFLECTORS

1. Slide the reflectors on the tube support/hanger brackets and through the wire hangers.
2. The tube at the coupling joints must be covered. Slide the reflectors together and provide an overlap of two
(2") inches for the first reflector overlap after the control unit. All remaining reflector overlaps will be
approximately one (1") inch. This will allow for the natural expansion and contraction of the heater when in
operation. Note: The heaters can expand and contract up to 1
Note: The heaters can expand and contract up to 1- - - - 3/4".
Note: The heaters can expand and contract up to 1
Note: The heaters can expand and contract up to 1
3. Secure the reflectors as shown in Detail "A" using #10 x 1/2" self-drilling sheet metal screws at each tube
support/hanger bracket.
40 FT SYSTEM SHOWN
Form 43343530
Aug 2012
bulator Sections
bulator Sections
bulator Sections
4
5
5
3
7
4
0
1
DETAIL “B”
-21-
3/4".
3/4".
3/4".
DETAIL “A”

Advertisement

Table of Contents
loading

Table of Contents