Inserting Turbulators - Space-Ray PTS 40-N7/L7 Installation And Operation Instructions Manual

Infrared radiant tube heater two stage push through system (positive pressure)
Table of Contents

Advertisement

4. Slide the next tube into the coupling.
5. Make sure both tube ends are butted together.
6. Finish tightening both bolts to 40-60 ft.lbs. torque to ensure a complete seal.
7. Use the two Self-drilling screws through the pre-punched holes to secure the tubes in the coupling.
8. Check to ensure that the hardware is completely closed and the band is seated on the reaction block and
interference pins as illustrated above.
9. Once all the heater body sections are attached, make sure that the heater system is level. If it is not, slight
adjustments can be made using the turnbuckles. (See Section 9.0)
10.2)

INSERTING TURBULATORS

1. Assemble the turbulators together by interlocking the slotted end portions. Slide these into the last tube
section until they are flush with the tube end. Note: Refer to the table below for quantities of turbulators
required for each heater model.
Important: NEVER
Important:
NEVER reuse a coupling
reuse a coupling. . . . Always install a new coupling only and
Important:
Important:
NEVER
NEVER
reuse a coupling
reuse a coupling
torque as per instructions above and the diagrams above.
torque as per instructions above and the diagrams above.
torque as per instructions above and the diagrams above.
torque as per instructions above and the diagrams above.
POISONOUS GAS AND SOOT HAZARD
-20-
Always install a new coupling only and
Always install a new coupling only and
Always install a new coupling only and
Form 43343530
Aug 2012

Advertisement

Table of Contents
loading

Table of Contents