STEP 1 DESULFATION
Detects sulfated batteries. Pulsing current and voltage, 
removes sulfate from the lead plates of the battery restoring 
the battery capacity.
STEP 2 BULK
Charging with maximum current until approximately 80% bat-
tery capacity. 
STEP 3 ABSORPTION
Charging with declining current to maximize up to 100% bat-
tery capacity.
STEP 4 ANALYSE
Tests if the battery can hold charge. Batteries that can not 
hold charge may need to be replaced.
STEP 5 FLOAT
Maintaining the battery voltage at maximum level by provid-
ing a constant voltage charge. 
STEP 6 PULSE
Maintaining the battery at 95–100% capacity. The charger 
monitors the battery voltage and gives a pulse when neces-
sary to keep the battery fully charged.
10 • EN
20016572A US 0.8 NG, Manual, Print file 001.indd 10

READY TO USE

The table shows the estimated time for empty battery to 80% 
charge
BATTERY SIZE (AH)
2Ah
8Ah
20Ah
32Ah
TIME TO 80% CHARGED
2h
8h
20h
32h
2011-06-17 11:16:09

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 1064 and is the answer not in the manual?

Questions and answers

Table of Contents