Blank Front Panels - NETGEAR M6100 Hardware Installation Manual

Netgear m6100 chassis switch
Hide thumbs Also See for M6100:
Table of Contents

Advertisement

Pull both handles outward to disconnect the module from the chassis backplane.
2.
Slide the module out of the chassis slot.
3.
Immediately place the module into the antistatic bag to protect it from potential ESD
4.
damage. The bag also prevents dust from collecting on the module connectors.
If you are not going to install a replacement module, install a blank front panel. To install a
5.
replacement module, see

Blank Front Panels

The switches are shipped with blank front panels installed over one or more chassis slots.
You can remove or install a blank front panel at any time without disrupting network services.
Complete the action of installing a blank front panel in a reasonable time frame to avoid
disruption to adequate airflow.
CAUTION:
Blank front panels must be correctly installed in all unoccupied slots in a
M6100 series switch chassis to ensure conformance to FCC requirements
as well as to maintain adequate airflow through the switch.
NETGEAR M6100 Switch Chassis
Sup erv
iso r
X CM
89 48
OO B
PW R
Res et
Co nso
/
Sta tus
le
US B
1
2
3
4
5
6
7
8
9
10
11
PoE (Ma
12
x 60W
per por
13
t): Off
14
= no
PD Gre
15
16
en =
PoE pow
17
ere d
18
Yell ow
= PoE
19
fau lt
RJ4 5
SPD /Lin
Install an M6100 Series Switch Blade
Install M6100 Series Switch Blades
46
20
21
k/A ct
22
Mo de:
Gre en
23
= link
24
at 1G
Yell ow
25
= Link
26
at 10/
100 M
27
Blin k
28
= AC
T
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
on page 42.

Advertisement

Table of Contents
loading

Table of Contents