Suzuki VL800 Supplementary Service Manual page 111

Hide thumbs Also See for VL800:
Table of Contents

Advertisement

• Install the O-ring and dust seal to each fuel injector.
• Apply thin coat of the engine oil to the new O-ring and cushion
seal.
#
Replace the O-ring and cushion seal with the new
ones.
• Install the fuel injectors 3 by pushing them straight to each
throttle body.
#
Never turn the injector while pushing it.
• Install the fuel delivery pipes 4 to the throttle body assembly.
#
Never turn the fuel injectors while installing them.
• Tighten the fuel delivery pipe mounting screws to the speci-
fied torque.
* Fuel delivery pipe mounting screw:
• Apply thin coat of the engine oil to the new O-rings.
#
Replace the O-rings with the new ones.
3.5 N·m (0.35 kgf-m, 2.45 lb-ft)
VL800K5 ('05-MODEL)
109

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents